The First Planner System is the upstream planning process where leadership defines how a project will be executed by establishing clear sequencing, structure, and strategy before construction begins. By creating a realistic and buildable plan, it reduces uncertainty, prevents downstream issues, and enables field teams to execute work efficiently and predictably.

First Planner System®

External Factors

Power to see the Paradigm
Mindsets & Paradigms
Goals of the system
Structure of the system
Rules of the system

Design & Precon

Project Proposal
Build the design team
Enable design
Builder Planning
Start strong

Production System

Team

Build the project team
Team Balance
Individual Balance

Plan

The Production Plan
Lean in Contracts
Manage Risks

Supply
chain

Procure Resources
Prefab
Logistics

Culture

Win over the Workface
Clean, Safe & Organized Project
Onboarding & Orientation

Trade Partner
Preparation Process

Buyout
Pre-Mobilization
Pre-Con Meetings
Safety
Quality
First in Place
Follow-Up Inspection
Final Inspection

What is the First
Planner System®?

The First Planner System® is a Lean pre-construction planning system that helps executives, project managers, and superintendents design project flow before work begins. It replaces rushing and guesswork with structured, flow-based planning—improving predictability, reducing rework, and setting up the field for reliable execution.
External Factors 1

External Factors

Focuses on identifying and managing outside influences early—such as approvals, regulations, site conditions, utilities, and stakeholder requirements—so the team can reduce risk, avoid avoidable delays, and remove barriers before they affect execution.

Design & Precon

Involves aligning design, scope, constructability, sequencing, budget, procurement, and coordination before work reaches the field, helping the team create a realistic plan, reduce rework and conflicts, and set up smoother execution.

TP3

It focuses on getting trade partners fully ready before and during execution by aligning scope, sequence, manpower, materials, tools, information, and handoffs so each crew can perform work reliably at the planned pace. This helps reduce variability and delays while supporting safe operations, meeting quality expectations, staying ready for inspections, and following a plan, build, finish-as-you-go approach.

Check out the system
on Miro Board

First Planner System

What Changes on
Your Project

01

1 Problems are solved earlier (not in the field)

Issues like design gaps, missing scope, or permitting delays get addressed in advance instead of showing up during construction.

02

2 The plan becomes clear and buildable

The project has defined sequencing, zones, and strategy—teams are no longer guessing how work should flow.

03

3 Less chaos and rework

04

4 Procurement and logistics stabilize

Long-lead items, materials, and resources are planned ahead, avoiding last-minute scrambling.

05

5 Execution becomes more predictable

Field teams can focus on delivering work instead of fixing the plan, leading to smoother flow and more reliable progress.

What You Get When
We Work Together

How leantakt
supports the system

01.

DEFINE & EXECUTE

02.

REDUCE & PROTECT

03.

FLOW & DELIVER

04.

CONTROL & SAVE

05.

ALIGN & SIMPLIFY

06.

BUILD & PROTECT

Our Resources

Elevating Construction Senior Supers Book2

Construction and leadership book cover

Elevating Construction Senior
Superintendents: Book 2

This book is all about rushing, pushing, and segregating workers. Era 2 is the era of administration where we have paperwork that monitors paperwork, managers that manage other managers, and reports that report on other reports.

Construction and leadership book cover

Elevating Pre-construction
Planning

This book is about construction and escape the disrespect, stress, and inefficiency of what the industry currently accepts as common.

Takt

The art of the builder
Takt Planning

In this book construction professionals learn how to schedule projects with flow.

Takt Steering and Control book cover by Jason Schroeder

Takt Steering
& Control

Takt Steering & Control: Creating & Maintaining Flow in the Field with the Takt Production System® (The Art of the Builder)

Construction leadership guide book

The Text & Audio Book Companion to Elevating Pre-
construction Planningo

This book introduces the First Planner System®, the system that makes Last Planner® actually work.

Onsite Consulting for
Project Planning

Website Developer Board2 1
Website Developer Board1 1
Women in hard hats reviewing plans on site

field Operations

Consulting Topics

FAQ

The First Planner System® is Elevate Construction’s Lean pre-construction planning system that helps teams design project flow before work begins, replacing rushing and guesswork with structured, reliable planning. ents and public works.

It addresses the full pre-construction picture—external factors, design and preconstruction, the production system, team, plan, supply chain, culture, and trade-partner preparation.

Executives, project managers, and superintendents who plan projects and want predictable, flow-based execution from day one.
Ideally during preconstruction, before field work starts—though teams can adopt it mid-project to bring structure and flow to their planning.
Instead of reactive, CPM-driven scheduling, it uses structured, flow-based pre-construction planning that improves predictability, reduces rework, and prepares trade partners early.
Better predictability, fewer surprises in the field, smoother trade coordination, and a production system that’s ready to run before construction begins.