Read 7 min

Welcome to today’s discussion where we’ll unravel the intricacies of baseline schedules in the realm of construction. In this blog post, our aim is to empower you with insights on understanding, utilizing, and safeguarding baseline schedules for effective project management.

I. Understanding Baseline Schedules

Definition: A baseline schedule serves as a fixed reference point, enabling a comparison of project performance over time. It acts as a benchmark for project managers to assess the progress of scope, schedule, and cost throughout the project life cycle.

Purpose: The primary purpose of a baseline schedule is to facilitate communication and planning. It’s not a rigid document but a dynamic plan that allows for adjustments based on the realities encountered during the project.

II. The Purpose of a Baseline Schedule in Construction

Communication and Planning: Baseline schedules are instrumental in communicating the project plan. They act as planning documents and become exhibits in the overall project package, setting expectations for the team.

Comparison and Decision-Making: Regularly comparing actual progress to the baseline schedule facilitates informed decision-making. Deviations trigger discussions on recovery plans or modifications, ensuring the project stays on track.

III. Important Reminders About Using Baseline Schedules

While baseline schedules are powerful tools, they require careful handling. Here are key considerations:

Logical Project Plan: Ensure the baseline represents a logical project plan. Involve the entire team during pre-construction, protect trade flow, and have contingency plans.

Protect Trade Flow: Avoid trade burdening and stacking in the schedule. Trades should flow seamlessly through the project to maintain efficiency.

Link Major Phases: Properly link major phases in the schedule. Consider factors like curing time for concrete and ensure a coherent flow of activities.

Consider Weather Risks: Analyze weather risks for the project and incorporate contingency into the schedule to account for potential delays.

Review with the Team: Conduct thorough reviews of the baseline schedule with the entire team, tearing it apart to ensure accuracy and realism. 

IV. Key Things to Watch Out For With Baseline Schedules

Expect Changes: Projects evolve, and the baseline schedule must accommodate changes. Don’t let the baseline restrict necessary modifications.

Include Buffers: A baseline schedule without buffers or contingency is destined for delays. Quality scheduling requires a realistic assessment of potential risks.

Beware of Software Constraints: Be mindful of software limitations that may restrict necessary changes to the schedule. Don’t let the tool dictate the plan.

Caution with Resource Recovery: Recovering delays solely with additional resources should be a last resort. Explore alternative strategies before resorting to resource-intensive solutions.

Protect Buffers and Contingency: Never let anyone prevent the use of buffers, contingency, or float. These elements are essential for managing variations and uncertainties.

V. Conclusion

In conclusion, a baseline schedule in construction should be a tool for empowerment, communication, and planning. When used correctly, it can enhance collaboration and decision-making. However, it’s crucial to be vigilant against misuse and ensure that the baseline remains a dynamic guide rather than a rigid constraint.

For further insights and practical guides on mastering baseline schedules, check out the linked blog post in the description. Remember, the key is to be in control of the baseline, not the other way around.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!