First planner system

Build the path to success with First Planner System.®

We use our time in design & Pre-construction to setup the right lean project management system.

  1. Design & Pre-Construction

    1. Proposal Phase

    2. Build The Pre-con Team

    3. Adapt & Enable Design

    4. Plan With Builders

    5. Prepare to Start Strong

  2. The Production System

    1. The Team

    2. The Plan

    3. The Supply Chain

    4. The Culture

    5. Training

General overview

The Integrated Production Control System™ has three components: The First Planner System™, the Last Planner® System, and The Takt Production System®. They cover the planning of a project, the project systems for running a lean project, and scheduling/controlling a project. Each system must be understood independently, and as it relates to the other two. Only when you are operating with the Integrated Production Control System™, unifying all phases and teams, are you able to reduce variation to the point of no impact, control the flow, and predict project success.

Integrated production
control system™ (IPCS™)

First Planner System

The First Planner System™ is successfully implemented when the team and the individual are healthy and balanced. We believe that a work/life balance means that we can be fulfilled and successful at work, and therefore take our satisfaction and contentment home and continue to build upon those feelings.

The Production system

Designed to integrate all critical design and pre-construction elements, this system ensures the creation of an optimal project management structure. Its thorough approach guarantees that every aspect of the project is meticulously planned, paving the way for a successful construction phase. See the detailed descriptions below:

Team

Represents the formation and development of the project team, including defining roles, responsibilities, and communication strategies. Ensuring the right mix of skills and expertise is crucial for project success.

Plan

Involves creating a comprehensive project plan that outlines the scope, timeline, budget, and key milestones. This detailed planning phase sets the foundation for all subsequent project activities.

Supply Chain

Focuses on managing the procurement and logistics of materials and services needed for the project. Effective supply chain management ensures timely delivery and cost efficiency.

Culture

Emphasizes building a strong project culture that fosters collaboration, innovation, and a shared sense of purpose among team members. A positive culture drives engagement and motivation.

Training

Involves providing ongoing training and development opportunities for team members to enhance their skills and knowledge. Continuous learning ensures the team is equipped to meet project challenges and adapt to new demands.

Check out the full system on Miro Board

Integrated Production Control System™

First Planner System™

External Factors & System Leverage Points

  • 1. Power to see the Paradigm
  • 2. Mindsets & Paradigms
  • 3. Goals of the system
  • 4. Structure of the system
  • 5. Rules of the system

Design & Pre-construction

  • 1. Win the project
  • 2. Build the team & set parameters
  • 3. Adapt & Enable the design team
  • 4. Develop the plan with the builders & communicate
  • 5. Prepare to start strong

Lean Project Management

  • Team: Build the team, win over the Workforce, Onboarding & Orientation, Clean, Safe & Organized Project
  • Culture: Quality & Standards, Lean Culture, Individual & Team Balance
  • Plan: Plan & Schedule, Lean in contracts, Risk & opportunity Register
  • Supply Chain: BIM Coordination & Procurement, Pre-fabrication & Logistics Systems
  • Training: Basic training, Role training & Master builder training

Takt Production System®

Takt Plan

  • 1. Takt plan creation
  • 2. Schedule use & Management
  • 3. First & Last Planner® Collaboration

Takt Steering & Control

  • 1. Constraint Management
  • 2. Roadblock Removal
  • 3. Zone Control
  • 4. Delay Management

Accountability

  • 1. Zero Tolerance
  • 2. Daily Correction System
  • 3. Quality at the Source
  • 4. Contractor Grading
  • 5. Team Health Score

Quality & Continuous Improvement

  • 1. Quality
  • 2. Continuous Improvement
  • 3. Customer Needs & Wants

KPIs

  • 1. Conditions of Satisfactions (CoS)
  • 2. Leading Indicators

Last Planner® System

Last Planner® System

  • 1. Meeting & Hunddle System
  • 2. Collaboration
  • 3. Planning Deliverables

Our Resources

Elevating construction
senior superintendents

This book is about building outstanding teams that develop remarkable projects.

The art of the builder
Takt Planning

In this book construction professionals learn how to schedule projects with flow.

A builder's guide to
lean tools

This book is about a builder's guide to applying lean tools in the field.

Elevating Construction Senior Supers Book2

Coming in July 2024

Onsite Consulting for Project Planning

FIELD Operations

Consulting Topics

Address

2828 N Central Ave
10th Floor - 716 Phoenix, AZ 85004

CONTACT US

Contact us

Note: If you get an error, please text Jason Schroeder @ +16025718987 or email him at jasons@elevateconstructionist.com