One of the biggest challenges many in the construction industry face is material procurement delays. If you’ve worked in construction long enough, you’ve likely experienced this issue firsthand.
The frustration of not having materials on time can throw off schedules, budgets, and project momentum. In this blog, we’ll dive deep into understanding the root cause of these delays and how to manage them effectively.
What is the Real Issue Behind Delays?
The most common culprit of delays is the unavailability of materials when they are needed most. But what is the real cause behind these delays?
The truth lies in a combination of market fluctuations, overproduction, and poor planning within the supply chain. Understanding the underlying systems is the key to overcoming these challenges.
The Importance of Systems Thinking
In construction, we often focus on quick fixes—adjusting schedules, placing early orders, or doubling up on purchases—but these solutions don’t always work. That’s because construction operates within a complex system.
In The Fifth Discipline, the author introduces the concept of “systems thinking,” which emphasizes the interconnectedness of all processes, actions, and decisions. Much like in construction, where every decision affects the bigger picture, systems thinking pushes us to see beyond individual fixes and focus on the entire supply chain.
For example, the famous “beer game” illustrates how market variations can cause overproduction and supply chain disruptions. A sudden spike in demand for a particular type of beer leads retailers to over-order.
As these orders pile up, the manufacturers struggle to keep up, resulting in bottlenecks, delays, and eventually, an overstock that nobody wants. This same cycle often happens in construction when contractors panic and over-order materials due to anticipated delays. Instead of smoothing the process, this reaction compounds the problem and leads to even greater supply chain instability.
The Construction Supply Chain and Panic Ordering
It wasn’t just the COVID-19 pandemic that threw supply chains off course. It was also our collective reaction to it. Factories shut down, supply capacity was reduced, and contractors panicked, leading to the same over-ordering seen in the beer game.
Contractors placed orders far earlier than needed and in much larger quantities, thinking it would safeguard them from delays. But in reality, this created backlog and further delayed materials, which worsened the problem.
To combat this, it’s crucial to adopt a more stable mindset and make appropriate, right-sized orders based on proper planning and accurate scheduling. The panic mindset must be avoided if you want to keep your projects on track.
Strategies to Reduce Procurement Delays
The good news is that there are proven strategies to minimize these procurement delays. Based on insights from Built to Fail by Todd Ziebell, here are some tips:
- Eliminate Unnecessary Bureaucracy: Too much paperwork and inefficient processes slow down procurement. Streamline your workflow by ensuring that submittals, designs, and orders are accurate and double-checked. Reduce any unnecessary layers of approval or documentation.
- Value Stream Management: This approach allows you to visualize the entire material flow—from the moment of order to delivery at the job site. By mapping out each step, you can identify areas where non-value-adding activities exist and eliminate them. Focus on what truly adds value to your project, whether it’s reducing paperwork, eliminating redundant processes, or cutting down on transportation delays.
- Strategic Partnerships: Build relationships with vendors to reduce lead times. Creating strategic partnerships with reliable suppliers helps ensure consistent delivery times, reduces variability, and enhances collaboration. These partnerships foster better communication and trust, which can help smooth over issues when they arise.
- Understand the Difference Between Lead Time and Cycle Time: Often, there’s a discrepancy between the lead time quoted by a vendor and the actual cycle time required to produce the materials. Ask critical questions: Is the delay due to market conditions, a vendor backlog, or simply a buffer time built into the lead time? Understanding these nuances can help you better manage your expectations and plan accordingly.
Final Thoughts on Managing Delays
Material procurement delays are a significant challenge in construction, but they are not insurmountable. The key is to start early, manage the process consistently, and stay on top of the details.
Proper planning, value stream mapping, and strong relationships with vendors will help you right-size your orders and reduce unnecessary waste. These steps ensure you maintain a balance between having enough inventory and avoiding overstock, which can be just as damaging to your project as delays.
By implementing these strategies and embracing a systems-thinking mindset, you’ll be well on your way to minimizing delays and keeping your construction projects on track.
Stay ahead of the game and create efficiency in your projects by following these proven techniques. Success is just a plan away.
I hope you found this blog post helpful and can use these strategies on your job sites. Let’s work together to minimize delays and create smoother, more efficient projects. Keep checking back for more tips and tricks on improving the construction process!
If you want to learn more we have:
-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here)
-Listen to the Elevate Construction podcast: (Click here)
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)
Discover Jason’s Expertise:
Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.
On we go!