Last Planner® System Training That Finally Holds in the Field
The Last Planner® System is a collaborative planning and control approach that enables field leaders to make and keep reliable commitments, ensuring that construction work is properly coordinated, constraint-free, and executed as planned. By focusing on making work ready, aligning trades, and measuring performance through metrics like Percent Plan Complete (PPC), the system improves workflow reliability and drives continuous improvement across the project.
Last Planner System®
Check out the system
on Miro Board
Masterclass Videos
Last Planner® System Explained: A Complete Overview for Construction Teams
10 Critical Improvements to the Last Planner® System (Most Teams Miss These)
Visual Planning in Construction: Scaling Clarity and Communication on Site
Macro Takt Planning Explained (How Takt Works with the Last Planner® System)
Pull Planning Step-by-Step for Construction (Last Planner® Made Simple)
Production Planning in the Last Planner® System (How to Build Reliable Plans)
Lookahead Planning Explained: 6-Week Make-Ready in the Last Planner® System
Weekly Work Planning Explained (How to Increase PPC and Reliability)
Day Planning in Construction
Daily Team Huddles in Construction: Aligning Trades, Leaders, and Flow
How the First Planner System® Supports the Last Planner® System in Construction
Our Services
Pull Planning (Phase Planning)
Collaborative phase planning sessions where trades pull from flow-based takt milestones, not CPM guesses.
Look-Ahead / Make-Ready Planning
A structured six-week look-ahead window where only sound, ready work enters the weekly plan.
Weekly Work Planning
Weekly work plans that are filtered from the pull plan and Takt plan, not rebuilt from scratch each Friday.
Daily Huddles & Day Planning
Transform your daily huddle by moving it to the afternoon-before, protecting the highest-value morning production hours.
Constraints vs. Roadblocks
Constraints – permanent or systemic limits inside the production system (zones, takt time, throughput, physical limits).
Takt Planning & Work Structuring
Design correct zones, takt time, and trains of trades well before execution.
Daily Zone Control Walks & Field Behaviors
Implement Daily Zone Control Walks to verify readiness, support handoffs, and surface roadblocks early.
What Changes on
Your Project
01
1 PPC climbs naturally
02
2 Handoffs become crisp
03
3 Roadblocks are identified
04
4 Foremen stop guessing
05
5 The job shifts
Last Planner® + Takt Planning+ First Planner System® = A Complete System
Takt Production System ®
First Planner System®
Takt Planing
Takt Steering and control
Why Your Last Planner®
System Feels Fragile
What you see on the job:
- Foremen frustrated and skeptical about another “Lean meeting”
- Superintendents feeling like they’re carrying the whole system alone
- Weekly meetings that feel repetitive and reactive
- Promises breaking, trust eroding, and roadblocks overwhelming the plan
- Flow collapsing under its own weight no matter how many sticky notes are on the board
The real root cause:
- LPS is being run on top of CPM schedules that were never designed for flow
- Milestones are mathematically generated, not flow-based
- Phases and zones are batched in ways trades cannot actually build
- Weekly plans are being created from scratch instead of filtered from a real production system
What You Get When
We Work Together
- Onsite or virtual Last Planner® System training* for leaders, supers, foremen, and project engineers.
- Facilitated pull planning sessions and Trade Partner Weekly Tactical meetings on your live project.
- A custom Takt Plan & Integrated Production Control System™ for your key phases.
- Visual boards and templates for look-ahead planning, PPC, Perfect Handoff %, Remaining Buffer Ratio, and Roadblock Removal Average.
- Coaching and playbooks your team can use on future projects without us.
Working Process
01
1 Assess & Align
Align leadership on goals, roles (First Planners vs Last Planners®), and expectations
02
2 Design for Flow
Define constraints vs roadblocks and set up the metric dashboard
03
3 Launch Last Planner® the Right Way
Introduce afternoon-before huddles and zone control walks in the field
04
4 Coach & Stabilize
Coach superintendents, foremen, and project engineers on behaviors, flow thinking, and roadblock removal
05
5 Standardize & Scale
Prepare your team to replicate the system on future projects (your own Integrated Production Control System™).
Who Our Last Planner®
Support Is Built For
General Contractors & CMs
- Running mid–large projects who want predictable flow instead of constant firefighting.
Owners & Developers
- Looking for reliable delivery, fewer surprises, and healthier project cultures.
Trade Partners & Specialty Contractors
- Who want their foremen respected, their time protected, and their work flowing.
Frequently Asked Questions
We answer everything by asking, “what would respect people?” What would respect our employees, our customers, society, and ourselves. We do not do things that disrespects people.
Yes. We regularly join teams on-site to facilitate sessions, coach leaders, and walk the field so the system is grounded in real conditions—not just theory.
Absolutely. We start with a pilot project, build your playbook, and then support you in scaling a standard Integrated Production Control System™ across your portfolio.