Directors That Destroy: How Scheduling Directors and General Superintendents Block Progress

Directors that Destroy title graphic with a quote about directors who protect their own tools and turf, beside a photo of a team leaning over a table to review plans
Read 8 min

I hope this doesn’t upset too many people, because I know there are scheduling directors and other directors reading this. Let’s assume I’m not talking about you unless you exhibit these behaviors. But there are a whole heck of a lot of general superintendents and scheduling directors getting in the way of proper progress, and instead of just railing on positions, I want to think about it from a proper perspective.

Short answer: Directors destroy progress when they forget that their first team is the leadership team, not their department. A good director follows the direction of the company, implements what’s good for the whole, serves the people, works as a team, and is selfless. A destructive director silos, protects themselves, goes rogue, and locks the company into only what they know, like P6 and CPM.

What Is a Director Supposed to Be?

I looked it up. A director is a person who is in charge of an activity, department, or organization. Now think about the concept of team one and team two. Team one is the board of directors, the leadership team, or the collective whole of the company leaders. If you’re in charge of scheduling, finance, or legal, those people are team two. You are loyal to leadership first and your people second.

People might be frustrated about that, but as Patrick Lencioni teaches with his first-team idea in The Advantage, the people will be better off that way. Think about your children. Would they be happier if mom silos with the kids, or if mom and dad are healthy and happy and take care of the kids together? In a company, the leadership team has to be high functioning for the teams they oversee to be happy. Otherwise there’s a lot of department infighting and a lot of people miserable. No amount of vulnerability, trust, or listening fixes that. We need the right people on the bus, the wrong people off, and the people in the right seats. See How To Build A Leadership Team.

Are General Superintendents and Scheduling Directors the Problem?

I know some killer general superintendents at Hensel Phelps, at Okland, at Saunders, and a couple at Shiel Sexton who are absolutely amazing. But when I travel the country as a whole, they’re the exception and not the rule. General superintendents and scheduling directors should never protect their supers and schedulers ahead of what’s best for the overall project and the company. Period. End of story. And these roles are starting to play savior and get in the way.

You hired them to… What destructive directors do
Follow the direction of the company Take their own path and go rogue
Implement for the good of the whole Focus on their role and what they know
Serve the people Protect themselves as their number one priority
Be a team, as part of team one Silo and shield their own department
Be selfless Serve themselves and their own people

What If You Hired a Chef for Your Family?

Here’s a fun analogy. What if you hired someone to cook for your family? If that chef says, I respect the husband, the wife, and the children, I’m going to cook what they like, follow the meals and schedule they asked for, serve them as my customers, and stay loyal to the people who hired me, that role works. You get great food and more time for outings.

Now what if that cook starts to silo and says, actually, I’m in charge of the cooking and I don’t need your input. They change the whole menu and schedule, start working one-on-one with your wife on a health plan, and then you find out they’re taking your wife out to dinners alone, without you. When you ask, they say, no, hold on, this is still my role. I’m still cooking for them. You’d say this is out of balance, out of order, and completely unacceptable. That might seem extreme, but I have multiple recent examples of scheduling directors doing just that.

Would You Hire a Hammer Instead of a Carpenter?

Imagine hiring somebody based on the tool they know how to use. A carpenter can build formwork, frame a house, and custom craft anything. What if we hired a person who only knows how to use a hammer? Most of the scheduling directors we’re hiring nowadays only know P6, or Asta, or Synchro, or Microsoft Project. All they know is CPM. If all you know how to use is a hammer, everything starts to look like a nail.

A scheduler isn’t qualified to be a director if they don’t know CPM in its proper form, takt planning in all its glory, the Last Planner System and short interval scheduling, and Scrum. They should know precedence diagrams, Gantt charts, storyboarding, logistics plans, sequence drawings, and how to interface with superintendents and field directors. The same goes for surveyors who only know how to spray points with a robotic total station. These positions have to be professionals, and they have to follow the direction of the company. See Takt and Scrum.

Who Owns the Schedule?

I’ve heard so many times, we could not re-sequence to get the trades better flow because our schedulers would have to work extra hours. Meanwhile, with the schedules they’re producing, the foremen, workers, and superintendents are out on Saturdays and Sundays. That’s the tail wagging the dog.

When I was at a large construction firm, the scheduling department was under field operations. They followed our direction, and they were first and foremost a cohesive part of our leadership team. I would never in my life let a scheduling director tell me how we’re going to schedule, that we had to use one software, or that they couldn’t make adjustments for the wonderful women and men in the field because they didn’t want to work more than 40 hours. It was never a scheduler’s job to do the schedule on a project. It was always the project manager and superintendent’s job, and it was delegated authority. If you don’t align with that authority, you have gone rogue.

What Should Leaders Do?

If your directors and schedulers don’t know takt, Last Planner, and Scrum, you might put them on notice that they have three months to learn it. Don’t hire directors unless they know them. Don’t allow someone to stay who is protecting their own position selfishly. And don’t write a job description that says they have to know P6. Say, I want you to know how to schedule and support the field.

No owner pays us for a survey, a schedule, or a hammer in and of itself. They pay us for the work. Your department is here to enable the work. So here is the challenge. Write down who your team one is, then check the last three decisions your department pushed back on and ask whether they served the field or protected you.

Bottom line: Directors work under leadership, follow direction, implement what’s good for the company, and serve the people, not themselves.

If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.

On we go.

Frequently Asked Questions

What is team one and team two for a director?

Team one is the leadership team, the collective whole of the company leaders. Team two is the department you oversee, like scheduling or finance. A director is loyal to leadership first and their people second, because the people are better off when the leadership team is high functioning.

How do scheduling directors get in the way of progress?

They silo, protect themselves, take their own path, and focus on what they know. Examples are saying we can only use P6 and CPM, blocking takt or the Last Planner System, and refusing to re-sequence for flow because schedulers would have to work extra hours.

What should a scheduling director know?

CPM in its proper form, takt planning, the Last Planner System and short interval scheduling, Scrum, precedence diagrams, Gantt charts, storyboarding, logistics plans, sequence drawings, and how to interface with superintendents and field directors.

People Also Read:
The Project Director – Roles & Responsibilities!
10 Leadership Mistakes That Disrespect Your Team
How To Build A Leadership Team
Lean Onboarding Series – Takt, Last Planner, Scrum, & CPM

If you want to learn more we have:

-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

Share:

    Share Link