If I Could Change One Thing About Construction, It Would Be Two Things
Here’s the deal. If I could change one thing about this industry, I would actually change two, because they are tied together and both of them are genuinely stupid habits we have normalized for far too long. Disrespect. And pushing.
Fix those two things, and almost everything else this industry struggles with starts to resolve on its own. Keep tolerating them, and no amount of better scheduling software or new terminology will save a project.
Disrespect Is a Contradiction, Not a Strategy
There is nothing dumber than disrespecting a workforce, genuinely angering the trades, and then expecting them to hand you a great finished project anyway. You cannot treat people poorly and then be surprised when the outcome reflects it.
Here is the actual mechanism at work, and it is closer to a formula than a vague sentiment. The owner’s treatment of the contractor shapes how the contractor treats the trades. That treatment shapes how trades treat their own workers. And the workers are the ones actually building the project, which means their experience is directly what the client ultimately gets. It is a chain, plain and simple, and if any single link in that chain breaks, the whole thing produces a worse result, regardless of how good the plan looked on paper.
That means respect is not a soft value layered on top of the real work. It is the actual mechanism that determines project quality. People have to become the genuine focus of everything a construction organization does, not because it sounds good, but because the chain simply does not function otherwise.
Think about how often a project blames the finished quality on the trades at the end of the chain, without ever tracing that quality problem back through the earlier links. A worker rushed, disrespected, or treated as disposable by the time work reaches them is inheriting the consequences of every link above them in that chain. Fixing the quality at the end almost always means fixing the respect somewhere further up.
Pushing Is the Other Half of the Problem
Pushing is the second thing, and it is just as damaging. I have heard superintendents proudly describe themselves as pushers, as if that were a qualification. It is the opposite. If someone tells you they are a pusher, that is a disqualifying statement, not an impressive one.
There is a real difference between driving with genuine urgency and pushing, and confusing the two is where this goes wrong. Urgency is fine. Pushing is never fine. Pushing looks like working overtime to compensate for a broken plan, adding labor and extra crews to force through a problem instead of solving it, bringing out too many materials to rush a fix, and cycling through rushing, pushing, and panicking as if that cycle were simply what construction requires.
Watch for these signs pushing has replaced genuine urgency on your project:
- Overtime and extra crews being used to compensate for the same recurring defect rather than fixing its root cause
- Decisions being made faster than the information supports, purely to appear responsive to pressure
- A pattern of rushing followed by panic followed by more rushing, with no point where the team actually stops to solve the underlying problem
Pushing does not just fail to solve the problem in front of you. It makes people think worse, make worse decisions, and do things that actively hurt and marginalize the people around them. If an owner, a general contractor, a superintendent, a project manager, or a foreman is genuinely a pusher, that behavior should be treated as immediately disqualifying. It is the worst combination in this entire industry, disrespect paired with pushing.
The Myth We Have Been Telling Ourselves
Here is something I have written about across an entire series of books, because I think we have gotten our own history badly wrong. Americans tend to believe our national greatness came from pushing through obstacles no matter the cost. Damn the torpedoes, full speed ahead. That story feels satisfying, and it is not actually where American industrial strength came from.
Look at the real history. During World War Two, supplies reached Europe through carefully coordinated convoys, not chaotic pushing. Commanders like General Patton succeeded because they were disciplined and regimented, training their people deliberately rather than simply demanding more speed. Back home, a genuine second industrial revolution took hold, built on emerging Lean practices out of the Bureau of Labor and on lessons learned from Henry Ford’s production methods. Those lessons eventually got exported to Germany and Japan during postwar reconstruction, and Japan in particular absorbed them deeply through figures like Deming. We taught the rest of the world these principles, and then largely forgot them ourselves at home.
American greatness never actually came from pushing or from disrespecting the people doing the work. It came from genuine coordination, discipline, and doing things the right, flowable way, grounded in real production theory and production science. That is the actual source, not the myth we have been telling ourselves.
Why These Two Things Are Actually the Same Problem
Disrespect and pushing are not two unrelated issues that happen to both be bad. They come from the same root cause. Both treat people as instruments to be used up in service of a number, rather than as the actual source of everything a project produces. Push a crew hard enough and you are disrespecting them, whether or not you would ever describe it that way. Disrespect a crew consistently and pushing becomes the default tool for managing them, since genuine collaboration has already broken down.
Fix one without fixing the other and the fix will not hold. A project that eliminates disrespect but still pushes will still burn people out. A project that stops pushing but still disrespects its workforce will still bleed trust and turnover. Both have to change together, because they reinforce each other in practice even when they get discussed as separate problems.
This is also why naming both explicitly matters more than it might seem. A leader who commits only to being respectful, without ever addressing the habit of pushing under pressure, will find that pressure quietly reintroduces disrespect anyway, the moment a deadline gets tight. Naming pushing as its own distinct problem, separate from respect but tied to it, closes that gap.
What Changing These Two Things Actually Requires
If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your organization build the discipline to lead with genuine urgency instead of pushing, and to genuinely respect the chain that runs from owner to contractor to trade to worker to finished building. That chain only produces a great result when every link in it is treated with the seriousness it actually deserves.
So here is the challenge. Look honestly at your own project or organization and ask where pushing has quietly become normal, disguised as urgency, and where disrespect has become an accepted cost of doing business, disguised as high standards. Both of those disguises are common, and both of them are worth removing directly rather than tolerating any further.
Jason Schroeder said it plainly: “That’s the worst thing in construction, disrespect and pushing.” Change those two things, and almost everything else in this industry starts to get better on its own.
On we go.
FAQ
What is the actual difference between driving a project with urgency and pushing it?
Urgency means moving with real purpose and pace toward a genuine, achievable goal, while staying grounded in sound decision making. Pushing means forcing progress through overtime, extra labor, and rushed decisions regardless of whether the underlying problem has actually been solved. Urgency respects the people and the process. Pushing sacrifices both in exchange for the appearance of speed.
Why does the article describe respect and disrespect as a chain rather than an individual behavior?
Because how an owner treats a contractor shapes how that contractor treats trade partners, which shapes how trades treat their own workers, and workers are the people actually building the project. A break in respect at any point in that chain tends to travel downstream, ultimately affecting the quality the client experiences at the end, which is why fixing disrespect requires attention at every link, not just one.
Why should a self-described pusher be considered disqualified from leadership roles like superintendent?
Because pushing produces measurably worse outcomes, worse decisions made under artificial pressure, defects rushed through instead of fixed, and people hurt or marginalized in the process. A leader who identifies pushing as a strength has confused a damaging pattern for a virtue, which suggests they do not yet understand the difference between genuine urgency and the harmful behavior pushing actually represents.
If you want to learn more we have:
-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here)
-Listen to the Elevate Construction podcast: (Click here)
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)
Discover Jason’s Expertise:
Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.