Why It Is What It Is Rarely The Right Answer To A Late Delivery

A trade partner calls to say an item is going to be late, and the common response is simple, it is what it is, and the delay gets passed straight to the owner. There is almost always a lot more that can actually be done first.

Where A Delay Gets Accepted Too Quickly

A procurement item falls behind schedule, and the default response becomes notifying the owner of a delay rather than genuinely working to recover the time first. That response feels realistic in the moment it happens. It usually skips right past a wide range of real options that could have actually solved the problem before it ever reached the owner at all.

Confusing Acceptance With Actually Managing The Problem

The failure pattern is treating a late item as simply given, rather than actively working through the real recovery options available at whatever phase the delay is actually happening in. A procurement log or a schedule that only tracks whether something is late, without actively managing recovery, misses most of the real value that active management could actually provide.

The System Failed Them, They Didn’t Fail The System

The system failed them, they did not fail the system. Nobody explicitly teaches teams the full range of real recovery options available across each phase of procurement, so it becomes easy to accept a delay as simply unavoidable rather than actively working to solve it.

Recovery Options Exist At Every Single Phase

During the submittal preparation phase, a trade partner can be helped directly, submittals can genuinely be expedited, and a project team can make the process easier by collecting needed data and clearly communicating real priority. During the internal review phase, a specific submittal can be moved up in the queue, the team can swarm it together, and additional help can be requested from estimators or other project resources. During the design team approval phase, submittals can be leveled instead of sent all at once, included directly in schedule reviews and owner meetings, reviewed together in a real time collaborative session, or even addressed through an in person visit when the stakes are high enough to justify it. Breaking a larger submittal into smaller portions can also get the most critical pieces approved sooner rather than waiting on the whole package together.

Recovery Options Continue Through Fabrication And Delivery

Once an item reaches fabrication, expediting can often be purchased directly, a shop can be visited in person, and in some cases work can even be moved to a second production site or supplemented by an additional contractor. Once an item is actually ready for delivery, a project team can take over the shipment directly, arranging to receive it personally rather than waiting passively for a scheduled delivery that may not actually happen on time.

Why This Distinction Matters

This matters because every single one of these options represents real effort, not simply hoping a problem resolves itself. A team willing to visit a supplier directly, explore an alternate through a request for information, fabricate something in house within spec, borrow from another project, or simply find a different vendor entirely has dozens of real paths toward recovery, not just one default response of accepting the delay as final.

A Realistic Target Worth Aiming For

A genuinely engaged team digging into all of these options together should realistically be able to identify twenty to thirty specific recovery ideas for any single late item, not just one or two obvious ones. That range of options represents real, active management of a supply chain problem, rather than treating a delay as something that simply happened to the project.

Recovery Options Worth Trying By Phase

Keep these in mind the next time a procurement item falls behind schedule.

  • Expedite submittals and clearly communicate real priority
  • Move a submittal up in the internal review queue
  • Level design reviews instead of sending everything at once
  • Visit a shop directly or use a second production site
  • Take over a shipment and arrange delivery personally

Connect To Mission

None of this means every late item can actually be fully recovered. If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow. It means genuinely exhausting real recovery options before defaulting to acceptance and passing a delay straight through to the owner.

Questions To Ask Before Accepting A Delay

Use these before treating a late procurement item as simply unavoidable.

  • Have you actually tried expediting at every phase of the process
  • Has your team physically visited the shop or the supplier directly
  • Have you explored an alternate, a substitute, or an in house option
  • Could another project or vendor genuinely help solve this faster

A Challenge For Every Project Team Managing Procurement

Here is the challenge this week. The next time an item falls behind schedule, challenge your team to find at least twenty real recovery ideas before accepting the delay as final. Real, active management beats passive acceptance every single time it actually gets tried.

On we go.

Frequently Asked Questions

Why shouldn’t it is what it is be the default response to a late delivery? Treating a delay as simply given skips past a wide range of real recovery options that could actually solve the problem, which means the owner often ends up absorbing a delay that could have genuinely been avoided.

What are some ways to recover time during the submittal phase specifically? Directly helping a trade partner, expediting the submittal itself, and clearly collecting needed data or communicating real priority are all practical ways to recover time before an item ever reaches internal review.

What are some ways to recover time during the internal review phase? Moving a specific submittal up in the review queue, swarming it as a team, and requesting additional help from estimators or other available resources are all direct ways to speed up an internal bottleneck.

What are some more creative, less obvious recovery options worth considering? Visiting a supplier directly, exploring an alternate through a request for information, fabricating something in house within spec, and borrowing from another project are all creative options many teams never actually consider.

How many real recovery options should a team realistically expect to find? A team that genuinely digs into every phase of the process should be able to identify twenty to thirty specific recovery ideas for a single late item, not just one or two obvious options.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.