People talk about this being fake lean, or that being fake lean. Probably the only fake lean is things that aren’t lean at all. The only thing I have ever criticized, here or anywhere else, is not trying or not caring. If you’ve got stickies and you’ve started, go for it. If you started your pull plan and did it the wrong way, great, go for it. I applaud you.
Short answer: There’s no such thing as fake lean when people are trying. Lean is respect for people and resources, stability and flow, total participation with visual systems, and quality and continuous improvement. If you have done anything to implement any lean concept, I will never call it fake lean. The practitioners calling things fake lean are probably the only fake thing.
What Is Lean, Then?
Here’s how I define lean:
| Lean is | What that means |
|---|---|
| 1. Respect for people and resources | The foundation of everything else |
| 2. Stability and flow | Work moving without stops and starts |
| 3. Total participation with visual systems | Everyone can see the plan and take part |
| 4. Quality and continuous improvement | Getting better every day |
So that’s lean. If it’s not that, it’s not lean, and I guess you could call that fake lean. But if you started putting up boards and having huddles and you don’t think you’re doing them right yet, great. You’re on your way.
Why Can’t Anyone Say You’re a Lean Company?
I remember a story Niklas Modig told me about a Japanese expert touring a company. The company said, we brought you here to see if we’re a lean company. Tell us, are we a lean company? They kept asking over and over, and he kept saying, hard to say, hard to say. Finally they said, we brought you here, now tell us. He said, I can’t say. Why can’t you say? Because I wasn’t here yesterday.
Continuous improvement and learning is lean. If anybody is doing their best to respect people at a fundamental level and learn lean, even if it’s as simple as a couple of stickies, it’s going to be all right. We’re on our way. We’re doing good things, and eventually it’ll all work out. None of us are perfect, and I wouldn’t call any of that fake lean.
The Post That Got My Ire
I read a post the other day that was really annoying. It said the writer was tired of people lining up to explain what respect for people means. It said respect for your peers starts at birth, that it’s not a concept Toyota gifted us, that it predates the Industrial Revolution, and that once it appeared on the TPS house as a pillar everyone jumped on the bandwagon to explain it. Stop it. Have some respect. It quoted Robert Burns, A Man’s a Man for A’ That, from 1795, and said respect for people is grounded in your own values and upbringing.
First of all, I don’t know why people who call themselves lean experts are going to make fun of people trying their best to do lean. If somebody is trying to explain certain concepts in the industry, they should. Calling them names isn’t only insulting, it isn’t accurate.
Did Toyota Gift Us Respect for People?
Here’s a surprise for you. The Toyota Production System did gift us the concept of respect for people, because I don’t know very many American companies that respect people. It does not predate the Industrial Revolution, unless you’re talking about the teachings of Gandhi, Zoroastrianism, or the teachings of Christ. That’s totally fine. But as a whole, we just don’t get respect for people. We never have, and we’re likely going to have a hard time unless we talk about it more and, quite frankly, force people into it, because our industry just doesn’t care.
Respect for people starts at birth? That is just not true. What starts at birth is following your peers in social groups and doing what the mob is doing. Otherwise, why would so many women, minorities, and protected classes have had such a hard time for so long?
So what would you like? Would you like everybody to just magically learn respect for people? Magically know that this is their expectation? Listen to Brené Brown: clear is kind. When the writer of that post says to stop talking about respect for people, I think he just wants to be heard, thinks it’s a given, and forgets that somebody taught him this.
So let me be clear. We’re not going to stop it. We’re going to keep talking about respect for people, because people don’t get it yet. And yes, talking about respect for people is going to change you, because if we make it popular and the expected way to do things, it will change. The mob has to align behind it. People need to be taught how not to be jerks.
Remember Drifting Into Failure. This industry will only change when leadership groups are connected to the workers, when they’re incentivized to care and fix the situations for the workers, and when it becomes the acceptable mode of behavior for the industry or social group they’re in. That post disregards the reality of what is happening in the field. For more, see Respect for People: The Foundation That Makes Lean Construction Work.
How Do You Set Up Pre-Construction for Takt?
Say you’ve just won a CM at Risk project to modernize a large headquarters building. You built a high-level takt plan for the proposal schedule, explained it in the interview, and it was a hit. What else should you do in pre-con? Book 2 of Elevating Construction Senior Superintendents (The First Planner System) covers it in detail. Here’s the high level, using old design terms:
- Proposal: build the plan, just like you did.
- Conceptual design: create a macro-level takt plan to know your total duration, plan company labor, and set GCs and GRs. Develop and organize your pre-con team and its systems, create conditions of satisfaction, set your meeting cycle, and create the vision for an integrated team, location, communication, systems, and design.
- Schematic design: keep updating the takt plan for flow. Do a utility review: soils report, foundations, and any underground power, gas, or comm lines to relocate, which can take months. Talk to your AHJs, set general phasing, start the procurement log, and kick off early-release trade partners.
- Design development: involve your builders, 100%. Look at permits, refine long-lead items, bring in HVAC, electrical, elevator, and likely exterior skin. Do constructability and budget reviews, mitigate risk, and develop the norm-level takt plan, zone maps, logistics drawings, basis of schedule, trailer layout, org chart, and risk and opportunity register.
- Construction documents: complete a fresh eyes meeting. Have it all ready to go into your GMP as an exhibit, or at least acknowledged by the owner. Queue up trades for QC, start your 90-day mobilization schedule, and start your quality process.
So here is the challenge. If you’ve been holding back on a board, a huddle, or a pull plan because you’re not sure it’s right, start it this week. Then improve it next week.
Bottom line: Don’t get distracted by naysayers who call themselves experts and look for significance by criticizing other people. Keep doing the great things you’re doing.
If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.
On we go.
Frequently Asked Questions
What is fake lean?
The only fake lean is things that aren’t lean at all. Lean is respect for people and resources, stability and flow, total participation with visual systems, and quality and continuous improvement. If someone is trying any of that, even with a couple of stickies, it isn’t fake lean.
Did Toyota give us respect for people?
Yes. The Toyota Production System gifted the industry the concept of respect for people, because very few American companies respect people. What people learn from birth is how to follow the mob, so respect for people has to be taught and made the expected way of doing things.
What should happen in pre-construction for a takt-planned project?
Build the plan in the proposal, create a macro-level takt plan in conceptual design, dig into utilities and the site in schematic design, involve builders and long-lead trades in design development, and have the takt plan, zone maps, logistics, procurement log, org chart, and risk and opportunity register ready for the GMP.
People Also Read:
What Is Lean Construction? (Simple Overview for Builders)
Respect For People In Lean Construction (What It Actually Looks Like)
Drifting into Failure, Part 1
Pre-Construction Planning: The Five Must-Do Items to Leave Precon Right
If you want to learn more we have:
-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)
Discover Jason’s Expertise:
Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.