How to Work With Owners on Your Scheduling System

Superintendent walking an owner through a takt plan on the trailer wall
Read 8 min

I get a lot of comments that say, we would do takt, or flow scheduling, or the Last Planner System, but our schedule specs, or our owners, won’t let us do it. That’s an accurate statement, meaning it’s something we’re really dealing with. But I have found owners to be very reasonable, at least 80% of them, when you go have a conversation with them.

Short answer: To work with owners on your scheduling system, don’t throw anything over the wall. Build a relationship with the owner, get on the same page, ask for what you want, and be transparent so you develop mutual trust. Then find a way to meet their scheduling specs legally while still getting flow and collaboration. Compose the situation. Don’t litigate it.

Should You Litigate or Compose?

Let me tell you a story. I read this in a church book. A senior church leader asked someone who wasn’t a lawyer to go take care of a situation. The person being dispatched said, why are you sending me? I’m not a lawyer. I don’t know how to litigate. I don’t know how to traverse these situations. The senior leader said, I don’t want you to litigate this. I want you to compose it.

Meaning, I want you to orchestrate a win-win for everybody. I don’t want you to go down there and fight. If I wanted you to go down there and fight, I could do it myself. And not all lawyers are fighters, so that’s not what I’m saying. The point is, some situations we just need to compose.

What Should You Say to the Owner?

Go to the owner and say: this is what we want to do for our schedule. This is what we want to do for our float. This is how we want to build it. This is how we want to create flow. This is our strategy. How can we find a win-win with you and your scheduling consultant? This is our general approach. This is our schedule for the schedule, and how long it’s going to take us to make it. This is the kind of transparency we want to have.

Why Can’t You Throw It Over the Wall?

I’m not being critical, by the way. I just think, from a data standpoint, you can’t take an owner with scheduling specs and throw something over the wall. You can’t do it with a CPM schedule. You can’t throw the takt plan over the wall. You can’t throw a norm-level takt plan over the wall. You can’t throw a pull plan over the wall. These things have to be explained.

That means three things:

Step What you do
1. Develop a relationship Get to know the owner before the schedule shows up
2. Get on the same page Align on the approach, the strategy, and expectations
3. Ask, and be transparent Ask for what you want, and develop mutual trust

If you do that, then when you present your high-level CPM, when you present your takt plan, and when they see you working with the Last Planner System on site, they’re going to be open to it, because there’s a measure of trust. See also Take the Owner with You!.

How Do You Meet the Owner’s Specs and Still Get Flow?

Owners have to CYA from a scheduling spec standpoint and a legal standpoint, and they have to appease certain people on their end as well. So find the way. How can you accomplish the scheduling specs, either in the prime agreement or in the Division 1 section of the specifications, in a way where you’re legally compliant, you can be audited, and you follow normal industry practices, but you also get flow and collaboration in your schedules?

The bottom line is we cannot do things just because someone told us to, just because we’ve always done it that way, or just because we think that’s what they expect. We need to go do the right thing. And again, we’re not fighting, we’re not litigating it. This is not email. This is not he said, she said. This is not putting people on notice. And it’s not chucking it over the wall and waiting for people to get upset because of expectations.

Align those expectations, compose the situation, and find the win-win for you and your owner. By the time they see that your CPM is high level, that your takt plan creates flow for the trades, and that your short-interval schedule is done with your last planners in a collaborative, open environment, they already trust you. They already know you. They already feel heard. They already know you’re going to do it in a legal manner, you’ve already asked, they’ve already given permission, and expectations have been managed and aligned.

So not only are you managing the schedule, you’re managing expectations and you’re managing relationships.

Is “My Contract States” a Warning Sign?

If you follow that path, we won’t have a lot of these conversations that start with, well, my contract states. In fact, if you have a good relationship with your owner, you would never think to say it, because you’d already be on the same page.

I’m starting to think, just now, that if we’re having conversations saying, well, my contract states, that’s probably an indicator that you don’t have a relationship with the owner. If you did, you’d probably say, my contract states this, but I have a good relationship, so this can become a conversation. So make it a conversation.

What If Your General Superintendent Won’t Buy In?

Here’s a question I get a lot. A superintendent starts at a new general contractor, on a team with a PM, a PE, and a general superintendent, and takes over most of the interior construction. When they arrived on site, cleanliness was atrocious. They’ve done their best to implement our philosophies, but the general superintendent doesn’t share the same outlook. What should they do?

That’s a tough one. It really is. If the general superintendent doesn’t buy in, my recommendation a lot of the time is to go do what you need to do anyway. Wholesale structural changes might be difficult. But in your area, start outfoxing the fox. Start thinking of ways and ideas to accomplish the same goal with different methods you’re allowed to use, and then take it as far as you possibly can.

If it’s unethical, you’re stuck, and you have to quit. You just have to leave and say, I can’t do this. I won’t work for a contractor that marginalizes people. But if you can get to a point where people are respected, with good enough bathrooms and decent enough sites where people can be safe, then go as far as you can and wait for your time to come. Don’t get a sense of learned helplessness. It’s really frustrating when things like that happen, but we just have to take it as far as we possibly can.

So here is the challenge. Before your next schedule submission, sit down with your owner and their scheduling consultant. Walk them through your approach, your float, your takt plan, and your schedule of the schedule, and ask how you can find a win-win.

Bottom line: Make it a conversation, build that trust, compose the situation, and make sure expectations are clear.

If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.

On we go.

Frequently Asked Questions

What if the owner’s scheduling specs won’t allow takt or the Last Planner System?

Have a conversation before you submit anything. Explain your schedule, float, strategy, and schedule of the schedule, and ask how to find a win-win with the owner and their scheduling consultant. Find a way to meet the prime agreement or Division 1 specs legally and auditably while still getting flow and collaboration.

What does it mean to compose a situation instead of litigating it?

It means orchestrating a win-win for everybody instead of going down there to fight. No emails putting people on notice, no he said she said, and no throwing the schedule over the wall and waiting for people to get upset.

What if my general superintendent won’t buy in?

Go do what you need to do anyway in your area. Outfox the fox: find ways to accomplish the same goal with methods you’re allowed to use, and take it as far as you can. If it’s unethical, you have to leave. Otherwise, wait for your time to come, and don’t fall into learned helplessness.

People Also Read:
Take the Owner with You!
Owners Trying to Control Their Contractors
Why Do Owners Lose Millions Because Of Bad Planning?
Construction Fails: How Project Owners Fail

If you want to learn more we have:

-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

Share:

    Share Link