In this post I’m combining a couple of topics. I’ll start with giving credit and respecting intellectual property, then get into the main point: superintendent competence, scheduling, and loading the train.
Short answer: There’s no such thing as a superintendent who doesn’t know how to schedule. The superintendent and PM own the schedule with the foremen. And a great schedule only works if the superintendent loads the train by preparing the work ahead of time.
Is This Just “Do What I Say”?
I heard a comment recently that the industry shouldn’t just do whatever I say. I get that a lot. I’m stubborn, opinionated, and passionate. But that perspective is a bit myopic, because I’m gathering the best information I can find from around the world, and I give credit to the people I collect it from: Felipe Engineer, Kevin Rice for the realized flow potential formula, Joel Hamilton for helping me write a book, Hal Macomber, Marco Binninger, Janosch Dlouhy, Niklas Modig, and many more. If I got it somewhere, I give credit. I only take credit for what I write, say, and come up with.
So I’m not saying do it because I say so. I’m saying here’s the best information I can find, and I’m going to be passionate about it. Take this post and implement it the way you want.
Why Does Intellectual Property Matter?
This may come off as a lecture, but I don’t mean it that way. Copyright protects creative works like computer code, photographs, artwork, and text. It protects the expression of an idea, not the idea itself. Moral rights, related to copyright, give the author the right to be identified as the author and to have the work not used in a way that hurts their reputation. Then there are trademarks, patents, and trade secrets.
When I left Hensel Phelps, I deleted my files. I’d had classes from lawyers saying, you can’t take this, it’s owned by the company. When I left DPR, I deleted all my files. People ask me for the schedules I talk about, and I don’t have them. When I left my next employer, we had an agreement that gave me a perpetual license to showcase the work I helped create. Elevate gives images, content, and articles to the industry. Use them, give us credit, and keep the logo on them. But don’t take the information into your company and sell it as your own courses. There is such a thing as doing the just and honorable thing. Superintendents and PMs, don’t leave a company and take their stuff. Delete your files.
Should Superintendents Know How to Schedule?
Let me say it one more time: there’s no such thing as a superintendent who doesn’t know how to schedule. When I was a field engineer, I wanted to become an assistant superintendent. I was told I couldn’t get the promotion without certain skills. So I bought a CPM book, shadowed CPM experts, went to a scheduling seminar, took the training and courses, practiced on a job, and then got the promotion. That means CPM, Gantt charts, pull planning, Last Planner, and now it should mean takt. You should know how to do those things. Read Having Schedulers Means We’re Doing It Wrong.
Why Do We Need Schedulers Anyway?
Some schedulers are really good. I just met one in Boston I love, and there’s one in Phoenix I absolutely adore. But on most projects, why do we need a scheduler? On a large project, maybe you need one for the program master schedule. But does the superintendent have a professional material orderer? A professional meeting runner? A driver? A professional email answerer? At some point, people need to do their jobs.
You might say, you own a scheduling company. Absolutely. It’s a scheduling development and training company designed to transfer the information, skills, and process to superintendents as quickly as possible. If you want company metrics, a high-level schedule, or support documents that make superintendents’ lives easier, I can totally go for that, just like a construction administrator. But being the main point for the schedule is not the scheduler’s job. It’s the superintendent’s job, with the PM, collaborating with the foremen on site through Last Planner.
| Scheduler role | Verdict |
|---|---|
| Program or corporate summary schedule | Fine |
| Support documents and metrics for supers | Fine |
| Running the project schedule for the super | Stop. The super won’t know the schedule, can’t run the job, and won’t load the work. |
What Does It Mean to Load the Train?
Here’s the analogy. Your zones are the train tracks, and your sequence of trades is the train. The train must flow through the tracks. But the schedule won’t work if the superintendent can’t load the cars. That means queuing up work: calling contractors ahead of time, making sure they’re coming on time, making sure trade partners can get to the site, that they know when they’re supposed to be there, and that they know the quality requirements. Read Zone Control: How to Manage the Speed of the Train.
I’m noticing that when superintendents aren’t in charge of the schedule, they also neglect to load the cars. I see beautiful, flowable schedules, and then the superintendent didn’t call in the order, or nobody told the trade partner they’d be needed in a couple of days. The trade is supposed to start next Tuesday and doesn’t show, and the superintendent says, I guess they didn’t show up. Did you have a preconstruction meeting with them? Did you call them? Did you confirm that morning? Or will you be a victim and say the schedule doesn’t work? The schedule works if you load the train. Then the trade partner says they need three weeks’ notice. You were supposed to see out ahead.
Can You Prepare Work in Your Head?
No human being can see, plan, prepare for, and remove roadblocks for work properly without a visual schedule. If you do it in your head, you will miss it. A superintendent should live in the next week, and the next six weeks at a minimum, asking: do we have the labor, the materials, the layout, the information? Then queue the work up and get the resources ready to follow the flow of the train. Read The Superintendent’s Crystal Ball.
So here is the challenge. Look at every trade starting in the next six weeks and confirm, by phone, that each one knows exactly when to show up.
Bottom line: Stop brokering out this hugely important task. Do your own scheduling and load the train. Scheduling is part of your job.
If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.
Want your team trained on this? See our Last Planner® System and Takt training.
On we go.
Frequently Asked Questions
Should superintendents do their own scheduling?
Yes. There’s no such thing as a superintendent who doesn’t know how to schedule. The super and the PM, collaborating with foremen through Last Planner, should be in charge of the project schedule. Schedulers can support, but shouldn’t own it.
What does it mean to load the train?
Zones are the train tracks and the sequence of trades is the train. Loading the cars means preparing the work: calling trade partners ahead, confirming they’re coming, making sure they can get to the site, and knowing the quality requirements.
Why should you delete company files when you leave?
Those files are the company’s intellectual property. I deleted my files when I left Hensel Phelps and DPR. Don’t take a company’s material, and don’t repackage someone else’s content to sell.
People Also Read:
Multi-Train Takt Planning
Foreman Series: Preparing Your Work Package
Roadblock Tracking Maps
What Does a Construction Scheduler Do?
If you want to learn more we have:
-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)
Discover Jason’s Expertise:
Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.