My buddy Adam Hoots put up a great post. He wrote that as a community, we’re familiar with the principles and practices of lean construction, but with any terminology there are bound to be misunderstandings and misuses of key terms. So he asked: what are the most common misuses of lean terms? Everything I say here is positive and respectful toward Adam. I want to highlight and accentuate some of the comments he got.
Short answer: Lean terminology matters less than lean application. Lean is respect for people and resources, stability and flow, total participation with visual systems, and quality and continuous improvement. Terms like takt planning, pull planning, and cycle time are adapted from manufacturing for construction, and that’s fine. People don’t misunderstand these systems because of words. They misunderstand them because they haven’t learned and implemented them.
Is Lean About Cutting Costs?
One commenter said lean as a term is misunderstood, and people with a peripheral understanding jump to cutting costs and staffing. He is absolutely right. Lean is not cutting costs. It’s not cutting people. It’s a completely different concept. Another said a common misconception is that lean equals layoffs. Same thing.
Lean in construction is number one, respect for people and resources. That’s a culture, a state of mind, and a business system. Number two, stability and flow. Three, total participation with visual systems. And four, quality and continuous improvement. It’s about structuring your people and systems so you deliver the desired product to the customer with the least waste, the shortest total project duration, the lowest total cost, and your best quality. See Defining Lean Construction And Why It Matters.
Are Stickies on a Wall a Pull Plan?
A lot of people confuse lean in general with the Last Planner System. That’s a very myopic view. Lean isn’t just stickies. It’s not just pull plans. You have lean tools, lean philosophies, and lean scheduling systems. To be a lean builder, you’ll have to adopt lean scheduling systems like takt, Last Planner, and Scrum, use lean tools, and have lean cultures like respect for people. But you can’t just say pull planning is lean.
One commenter said the term pull plan covers any activity involving stickies on a wall, when it may be a weekly work plan or the start of a Kanban board. I appreciate that. One of the main reasons you pull backwards is to focus on predecessor activities and needs before you create a sequence, instead of organizing it in a push format.
Is Lean Something New?
Another commenter said lean isn’t something new. I disagree. Lean is something new, a hundred percent. There are a lot of people who think they’ve been doing lean for years and they haven’t. Historically, as an industry, we push people. We don’t standardize or stabilize. We don’t get schedules going the same speed, the same distance apart. We batch too large of zones. We don’t pull. We don’t include the trade partners. We don’t ask why five times. We don’t do one piece flow. Ask a group what’s faster, batching or one at a time, and they’ll all say batching. That’s not true.
Someone else made a good point that lean principles were used a hundred years ago in shipbuilding and on buildings like the Empire State Building. Our industry took the wrong turn when it adopted CPM methodologies, and we’ve taught the last four or five generations improperly. The concepts existed, but in application in construction, lean is new and everybody ought to learn it.
Are Lean Tools the Problem?
There’s a lot of bashing out there about lean tools, and I think it’s a mistake. I don’t know of anybody throwing out lean tools to the detriment of lean cultures. It’s going to take lean tools, lean concepts, and lean cultures together. When you study the house of lean or the Toyota Production System, it’s always built on people and process together. It works as a complex system. If you don’t have the right culture, planning, supply chain, controls, and Last Planner, takt, and Scrum, the system will not work. See What Lean Construction Is (And What It’s Not).
How I Define the Terms
| Term | How I use it |
|---|---|
| Pull planning | Collaboratively creating a sequence based on predecessors and needs with trade partners for a specific phase in a specific zone |
| Last Planner System | Master schedule, pull plan for phase planning, six-week make-ready lookahead, weekly work plan, day plan, and tracking percent plan complete (PPC) |
| Takt planning | A true lean construction schedule where a train of trades flows through zones at the same speed, the same distance apart, with leveled crews in leveled zones |
| Takt control | Adjusting and controlling the flow of the system in spite of delays |
| Scrum | The office team’s system, pulling roadblocks and needed resources from the takt plan so everyone can see the plan and help |
| Cycle time | In construction, micro cycles or task cycles, because a whole-project cycle time is too complex to be useful |
Takt planning is a term the industry coined. I could call it flow scheduling. But we need to ride the wave of popularity. If a term is already popular, what helps people most? To bring it back to its original meaning and make it more accurate, or to criticize and abandon it? We are in construction. Manufacturing terms like cycle time and takt time give unidimensional solutions to multidimensional problems, so we adapt them, and the systems we teach clients shorten schedules.
Why Aren’t People Learning Lean?
When someone says hearing “takting a plan” is like nails on a chalkboard, what did that serve? Nails on a chalkboard is when workers and foremen are disrespected because they don’t have the proper systems in place. A lot of the frustration from intellectuals is that the content has been hidden in white papers. Where are the YouTube videos and the trainings? Dissension and criticism without help hurt more than an improper term. People don’t experiment when there’s this much chaos.
And let me say this once. Paul Akers has probably done more for the construction industry than anyone else to scale lean practices. Ask people who are implementing today, and most will tell you the first book they read was Paul Akers’ 2 Second Lean. See What Is Lean Construction? (Simple Overview for Builders).
So here is the challenge. Pick one lean term your team argues about. Learn the system behind it, implement it on one project, and then talk about the word.
Bottom line: You learn lean from application, training, and implementing in the field, not from a dictionary, and the people implementing in the field aren’t trifling over words.
If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.
On we go.
Frequently Asked Questions
What does lean mean in construction?
Lean is respect for people and resources, stability and flow, total participation with visual systems, and quality and continuous improvement. It is a business system and a way of thinking, not cutting costs or cutting people.
Is pull planning the same as lean?
No. Pull planning is how you collaboratively create a sequence based on predecessors and needs with trade partners for a specific phase. It is one part of the Last Planner System, which is one part of lean. Stickies on a wall don’t automatically mean lean.
Does it matter that construction uses takt differently than manufacturing?
No. Construction is a different ballgame, and manufacturing terms like takt time and cycle time are adapted for it. People don’t misunderstand takt planning or pull planning because of a terminology problem. They misunderstand them because they haven’t learned and implemented them.
People Also Read:
Pull Planning Step-by-Step for Construction (Last Planner®️ Made Simple)
Takt and Scrum
Respect for People: The Foundation That Makes Lean Construction Work
Why I Care About Lean Construction
If you want to learn more we have:
-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)
Discover Jason’s Expertise:
Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.