How to Spot a Fake Lean | Last Planner® Consultant

Last Planner and Takt Misconceptions graphic
Read 9 min

Beware: if you are a Last Planner consultant who hasn’t learned how to do takt and Last Planner, this might be triggering. I’m being respectful because I love you. When implementing the integrated production control system and the takt production system, I often get to work with wonderful human beings who are Last Planner consultants, and I come behind a lot of consultants and fix a lot of their problems. Here are the most common misconceptions.

Short answer: Last Planner is a great benchmark, but it’s one step in an overall process. It must be paired with takt as the master scheduling system. Predictive planning works in takt. CPM milestones batch your pull plans. Rolling pull plans make trades do your job. Pull plans become takt sequences, not static boards. And “it’s up to the team” is an excuse, not a strategy.

Why Isn’t Last Planner the Whole Thing?

Everyone talks about pull planning, which I love, or collaboration, or building trust. I explained it with fasting. Picture somebody on YouTube saying, let’s talk about refeeding, pay me to do a refeeding training for your company. Refeeding matters, or you can get sick. But is refeeding everything about fasting? No. You need the science, the interval, hydration, and nutrients too. And if somebody just said, go without food, they’d get someone hurt.

That’s what the industry does when it only talks about Last Planner. They developed the Last Planner System, a great benchmark, but didn’t take it to the next step or have to implement it and provide results on project sites. But it’s one part, and implementing just one part can be quite dangerous.

Misconception: “It’s Up to the Project Team”

If a consultant says lean can only be implemented if the project team wants to, that’s their fail-safe and excuse. If it fails or there are no results, they fall back on it: it was up to the team, you can’t force them, stay away from command and control.

Part of this is true. You have to explain the why, train people, get buy-in, and connect, 100%. But I care more about the foremen, the workers, and doing what’s right for the industry than about what a couple of people want. Ask kids if they want to brush their teeth or go to school. No. I don’t care what project teams want. We pay people to do their job. I don’t have to beg a project team to do their job. It’s a minimum requirement.

Misconception: “Takt Is a Tool”

Experts reference Glenn Ballard and Iris Tommelein’s Current Process Benchmark for the Last Planner System (2016, updated in 2020). I’ve read it multiple times. It heads toward using all these systems in an integrated way. Call it the takt production system using Last Planner, or Last Planner with a takt master scheduling system. Fine. But you cannot divorce Last Planner from takt.

If somebody says, I use Last Planner and takt is a tool for things like multifamily, you know they’re not current and can’t provide a lean scheduling system. Takt always had steering and control, control boards, and a meeting structure, and could stand alone without CPM or Last Planner. See Pair Takt Planning with Last Planner.

Misconception: “Don’t Plan Too Far Ahead”

You’ll hear there’s a difference between predictive planning and production planning, and that only short-interval planning with the trades is reliable. That’s a fallacy. Follow it and you’ll have great look-ahead sessions with foremen who are mad because they don’t have the materials, labor, equipment, or information.

Predictive planning in CPM is a waste of time. In takt, it’s not. At Elevate, we do macro-level takt planning with the first planners, with a calculator and formulas, so the duration is right and the project team isn’t set up to fail. When trade partners come on board, we pull plan and optimize, usually by reducing takt time and increasing zones proportionally. We gain buffers and get a collaborative sequence. If people say don’t do too much predictive planning, it’s only because they don’t know how.

Misconception: “Pull Plan to CPM Milestones”

The CPM milestones aren’t correct, and pulling to them gives you a batched sequence that wastes weeks or months. Takt must be the backbone, in a time-by-location format. Nobody has shown me a CPM schedule winning a delay claim; it comes down to who has the best lawyer. If you must have CPM, summarize the takt plan in a very high-level CPM and do your time impact analysis. Read CPM Is Just a List, Takt Is a Recipe.

Misconception: “Takt Is Too Advanced”

I hear, start slow with Last Planner, takt is for people who know what they’re doing. Surprise: superintendents don’t know CPM either. So yes, you can implement takt and Last Planner. Train, help, and scale it right, instead of the wishy-washy “do you want to do this? Let’s throw stickies on the wall.” Is it lean to learn something and stubbornly stick with it? Excuse after excuse is a red flag that you have the wrong consultant.

Misconception: Rolling Pull Plans

Some consultants pull plan the next three, six, or 12 weeks on a rolling cycle. That’s chaos: guessing, misaligned supply lines, trade overburdening and zone stacking, batched work, no handoffs, and hours of wasted trade partner time. You’re asking them to do your job. Look-ahead and weekly work plans must be filtered down vertically from coordinated takt plans.

Do you lose collaboration? No. First planners did the macro. Last planners did the norm, then weighed in on the look-ahead, the weekly work plan, and the day plan. That’s four times in a stable, collaborative system.

Misconception: Pull Plans Stay in Software

Pull plans become takt sequences. Never pull plan without knowing how many zones the phase needs, or you’re batching work. The central concept of lean is one-process flow. Little’s Law (work in progress = throughput x cycle time) shows why: less work in progress and smaller batches shorten how long the work takes. Some lean software just keeps pull plans as a visual board. In the takt production system it’s work-packaged, flow-analyzed, and becomes your six-week make-ready look-ahead, weekly work plan, and day plan, printed in the field. Your workers won’t reference a pull plan in software.

Misconception Reality
Takt is a tool Takt is the master scheduling system
Rolling pull plans Filter plans down from the takt plan
Track percent plan complete Use takt control to correct

What About Percent Plan Complete?

I never worry about it. In hundreds of projects, I’ve never seen anyone make a corrective action by tracking it. I’ve seen corrections from takt control, the six steering methods, recovering from delays, and getting trades back in their wagons. Knowing you have a layout problem doesn’t say where or why. Track it in Excel if you want. It’s not a big deal. See Why PPC Does NOT Work.

Is Lean Rainbows and Butterflies?

Planting a bunch of seeds to see what blossoms is the most unimplementable comment I’ve ever heard. Lean is six weeks of an absolute dictatorship, forcing people to do their jobs, then they see the results and can choose. Implementing lean means training, the why, buy-in, field walks, and no choice of what we’re doing. How we execute, start activities, flow, and hand off is within your purview. What we do has been decided. We will run clean, safe, organized, lean jobs with foreman and worker huddles, takt, and Last Planner, done the right way.

To consultants who are offended: I love you. Steal the content and go be awesome.

So here is the challenge. Look at your lean approach and find one back-pocket excuse you’ve been leaning on. Replace it with training and a plan this week.

Bottom line: Last Planner must be paired with takt, and there is a right way to do it.

If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.

On we go.

Frequently Asked Questions

Is takt just a tool you use with Last Planner?

No. Takt is the master scheduling system, paired with Last Planner. Takt always had takt steering and control, takt control boards, and a meeting structure, and it could stand alone. You cannot divorce Last Planner from takt.

Is predictive planning a waste of time in lean construction?

Predictive planning in CPM is a waste of time, but predictive planning in takt is not. Macro-level takt planning with the first planners, then norm-level pull planning with the trade partners, gets materials, labor, equipment, and information lined up before the short-interval planning starts.

Should trade partners pull plan every three to six weeks?

No. Rolling pull plans create guessing, misaligned supply lines, zone stacking, batched work, and wasted trade partner time. Look-ahead plans and weekly work plans must be filtered down vertically from takt plans that were already coordinated, then adjusted.

People Also Read:
What Questions Should a Buyer Ask Any Lean Consultant Before Hiring Them?
Takt & Last Planner
Filter Weekly Work Plans from the Pull Plan
Pull Planning Mistakes to Avoid

If you want to learn more we have:

-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

Share:

    Share Link