The Fastest Way to Stabilize a Chaotic Job Site

The Fastest Way to Stabilize a Chaotic Job Site: if a boat is sinking, do you bail out the water or plug the hole? Get ahead of the entropy.
Read 9 min

I want to show you the fastest way to stabilize a chaotic job site, and exactly how to stop a project from spiraling out of control. This applies everywhere in construction. I have had to do it even on great jobs.

Short answer: The fastest way to stabilize a chaotic job site is six steps during execution. Get ahead of the entropy with a daily correction system. Declare a 6S reset to perfect standards. Unstack and unburden the trades. Install the afternoon foreman huddle and morning worker huddle. Walk your handoffs with zone control. And when something goes wrong, stop and call the right foreman to solve it on the spot.

What Does a Truly Lean Job Site Look Like?

I was recently a keynote speaker at the Lean Solutions Global Summit, and I got to be on a panel where the audience asked questions. I was asked, how will you know the industry has become Lean? What will you see, and what will you not see?

Respect for people, nature, and resources is a given. On top of that, I said I will see people stopping to get safety, cleanliness, and quality right, and pausing on site without shame, at least in the United States. And what I will not see is uncleanliness. If the site is clean, safe, and organized, I will see problems. And if the team is actually stopping to get it right, I know people are seeing what they need to see and making it right. That is the exact answer for how to stabilize a project site. I have written more about this vision before.

Stop During Execution, Hurry Up in Planning

I do not want anybody to misunderstand me. Once we are past notice to proceed and into execution, I am a huge believer in stopping to get things right, because the stakes are high. In construction there will be an andon, and we will stop and be stable.

But when it comes to planning, I am a hurry-up-and-start kind of guy. I do not want an andon in planning. I want to draw it on paper or a whiteboard, mess it up, erase it, and do it again. I am never waiting in pre-planning, because every hour I grind there is worth a day of stability in the field, and every day is worth a week. I have written about this in Hurry Up and Plan.

So when I talk about stabilizing, I mean during execution, when we are protecting the lives of workers, foremen, and everybody else on site. Here are the six steps.

Step 1: Get Ahead of the Entropy

Getting ahead means making improvements immediately that outpace the natural entropy of the job. Every day, I am going to get ahead of the mess, ahead of the logistics, and ahead of everything I need on site. This is in the Integrated Production Control System (IPCS) Guidebook, the First Planner System book, and the Takt Production System book, and it is part of our Takt Production System Masterclass.

I typically do it with what I call the daily correction system. I have a WhatsApp chat with all of the trade foremen, and one with my internal logistics carpenters and laborers. I send things like:

  • We need steps here.
  • We need to clean up that pile here.
  • We need to sweep the walkway here.
  • We need to upgrade these bathrooms here.
  • We need a sign here.

If a boat is sinking, do you bail out the water or plug the hole? This is plugging the hole. I want to fix things before they become a problem. These first steps can switch order depending on the job.

Step 2: Declare a 6S Reset

Next, declare a reset. We are going to 6S the jobsite: sort, straighten, shine, standardize, and sustain, and I add safety. That is why 6S is great in construction. I do not mind if you use 3S like Paul Akers, 5S like we have been taught, or 6S like I do. Clean everything, make everything safe, and organize the site.

And I mean perfect. No standards are easy to maintain because you do not have to monitor them. Perfect standards are easy to maintain too. Anything in the middle has lots of gravity. If you are okay or mediocre on a site, it will take every ounce of your energy to maintain. It is either no cleanliness or perfect cleanliness. I have written about why you should never find yourself in the middle.

Step 3: Unstack and Unburden the Trades

Problem What it is What to do
Trade stacking Too many trades in one zone, non-consensually, unsafely, and unnaturally Get rid of it immediately
Trade burdening One crew that was supposed to flow is now asked to work in multiple areas because you are behind Get rid of it immediately

That means we want a production plan that is reset and restabilized.

Step 4: Install the Huddle System

Immediately implement the huddle and meeting system:

  • An afternoon foreman huddle to plan the next day.
  • A morning worker huddle to communicate the plan to everyone on site every day and build a culture.

The book Takt Steering & Control goes deeper on this meeting system.

Why Don’t Morning Foreman Huddles Work?

You cannot have foreman huddles the morning of. I dislike that the Lean community teaches that. If you do it that way, you either will not properly plan anything for the day, or you will reroute the crews’ work. It never has worked, and it never will.

In a morning foreman huddle, everybody says, I am on level three, area A, with five people. Nobody cares. What matters is where the change points and handoffs are, and what each crew needs. If you do not know that the day before, you do not have time to get it, you are in trouble the next day, and you are disrespecting people’s time. Plan the next day in the afternoon, and communicate it to the workers in the morning.

Step 5: Walk Your Handoffs With Zone Control

After the morning worker huddle, go out and walk the zones. Not all the zones. Walk the handoffs, wherever one trade is pulling another trade in behind it. That is called zone control. If you get over 80 percent good handoffs, you are jamming.

Step 6: Stop and Call Instead of Chasing

I learned this from a superintendent when I was working at Hensel Phelps. Instead of running around chasing everybody, he would stabilize the site by calling or radioing the trade: hey, we have such and such, can you or one of your lead persons meet me right now to solve this? That is called stop and call. Stop, call, get help immediately, and knock out issues one at a time instead of going all over the place.

A huge idea for you is to put all of your trade foremen on a radio. And do not start creating a big punch list. That is a complete waste of time. Solve problems fast, and track the ones you cannot solve on the spot.

If you want to go deeper, check out my first book, Elevating Construction Superintendents. It walks you through this process so you can stabilize.

So here is the challenge. Pick the step your jobsite is missing most, and start it tomorrow. If you are not sure, start with the 6S reset, because you cannot stabilize what you cannot see.

Bottom line: To stabilize a chaotic job site, get ahead of the entropy, reset to perfect, unstack the trades, huddle every day, walk the handoffs, and stop and call instead of chasing.

If your project needs superintendent coaching, project support, or leadership development, Elevate Construction can help your field teams stabilize, schedule, and flow.

Want your team trained on this? See our Last Planner® System and Takt training.

On we go.

Frequently Asked Questions

What is the fastest way to stabilize a chaotic job site?

Get ahead of the entropy, declare a 6S reset, unstack and unburden the trades, install the afternoon foreman huddle and morning worker huddle, walk your handoffs with zone control, and stop and call.

What is 6S in construction?

It is sort, straighten, shine, standardize, and sustain, and I add safety. You can also use 3S or 5S, as long as you clean, organize, and make the site safe.

What are trade stacking and trade burdening?

Trade stacking is too many trades in one zone, non-consensually and unsafely. Trade burdening is asking one crew to work in multiple areas because the project is behind.

Why don’t morning foreman huddles work?

Because you cannot get what a crew needs the same morning. Plan the next day in an afternoon foreman huddle, and use the morning huddle to communicate the plan to the workers.

What is a stop and call?

Instead of chasing people, you call or radio the trade foreman to meet you right away and solve the issue on the spot, one issue at a time.

People Also Read:
If I Took Over Your Jobsite Tomorrow, Here’s What I Would Do First
What Is 5S and How It Applies to Construction
Clean, Safe, and Organized: The Foundation of a High-Performing Job Site

If you want to learn more we have:

-Takt Virtual Training: (Takt Virtual Training)
-Check out our YouTube channel for more info: (Elevate Construction on YouTube)
-Listen to the Elevate Construction podcast: (Elevate Construction Podcast)
-Check out our training programs and certifications: (Training Programs and Certifications)
-The Takt Book: (The Takt Book on Amazon)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction. As the company’s Founder and COO, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

Share:

    Share Link