Why You Can’t Fix Construction

Read 9 min
In this blog, we’ll explore why fixing the construction industry is nearly impossible and delve into the mindset and tools you can adopt to make progress in any attempts to improve it. So, if you’re curious about why the system prevails, what that system is, and the key factors that keep it in place, you’ve come to the right place. Let’s get started.

How The System Protects Itself

The construction industry has learned and implemented key principles from various influencers throughout history, which have been codified into systems. These systems are designed to protect themselves with checks and balances, creating a cycle that perpetuates inefficiencies. A key takeaway: the system always protects the system. The book Built to Fail sheds light on how the construction industry has repeatedly fallen into the same traps. The following eras illustrate these key mistakes:

Biggest Mistakes From the Era of Taylorism

The first era, marked by Taylorism, focused on speeding up workers by measuring output—how many nails could be hammered in an hour or how much work could be done in a given time. This era perpetuated the false belief that more people equal more work. In reality, this leads to overburdening, rushing, and stacking people in a way that reduces efficiency.

Biggest Mistakes From the Era of Administration

The second major mistake arose during the Era of Administration, where adding more managers was seen as a way to increase productivity. This belief led to an excessive focus on hierarchy and paperwork, resulting in more administrative layers rather than actual production. Systems built around administration further disrespect the people doing the actual work. These mistakes have now been codified into systems that protect themselves. To move forward, we need a shift toward production systems and lean thinking.

Why You Shouldn’t Push & Rush Workers

Pushing and rushing workers doesn’t work. Lean thinking teaches us to focus on improving processes rather than blaming individuals. When workers are rushed, the system creates bottlenecks—like a kink in a hose. More pressure doesn’t fix the kink, it just damages the hose. Similarly, applying more pressure on workers results in inefficiency and reduced output. Instead, we should focus on making work “ready,” ensuring the processes are smooth, rather than overloading people.

The Nature of People in Administrative Positions

The current system fosters an environment where mid-level managers are focused on protecting their jobs and their processes. This means more wasted effort on unnecessary tasks like critical path analysis and slippage reports. People who’ve built careers around these outdated methods are unlikely to change, as they resist disruption to their comfortable positions.

How Construction Contracts Are Designed

Construction contracts are often written in a way that pits stakeholders against one another, incentivizing rivalry rather than collaboration. Instead of trade partners working together, they compete in toxic ways. This creates a myopic focus on individual profits, where, in reality, nobody wins unless everyone wins on a project site.

How Segregation of Labor Leads to More Waste

Taylorism led to the segregation of labor into specialized trades and classes. As a result, what could once be done by one contractor now requires coordination between 15 different entities. This increases waste and inefficiency.

Ignorance From Builders & Lack of Training

The industry has moved away from self-performing general contractors who understand the building process. Instead, we’ve moved to a world where construction managers are merely brokers, leading to disorganization and a lack of effective project execution. Compounding this issue is the lack of budget for proper training in the industry, meaning we have a generation of so-called builders who are not adequately prepared.

Other Systematic Flaws

While the examples above highlight some of the most glaring issues, there are many more, such as:
  • Government contracts that prioritize administration over actual building.
  • A focus on the lowest bid, incentivizing contractors to cut corners.
  • A systematic disconnect between designers and builders.
  • Corporate systems that stifle innovation.

How We Can Fix the System

To fix construction, we need leaders with the authority and mindset to change the system. They must focus on creating a production system that respects people and fosters collaboration. Until we change the systems and governing bodies that regulate the industry, we won’t make real progress. I hope this blog gives you some insights into why the construction industry remains broken and what can be done to start fixing it. Let’s work together to make a positive change.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

Construction Fails : How Project Managers Fail?

Read 8 min
In this blog, I will walk you through a comprehensive “how-to” guide on failing as a project manager. By following these steps, you will not only undermine your projects but also ensure a lack of support for your team, damaging both your professional and personal life. So, if this is what you’re aiming for, you’ve come to the right place!

Why You’d Want to Be an Incompetent Project Manager

The first key to being a terrible project manager is to be easily distracted. You can blame everyone around you for your failures, including the superintendents, owners, and teams. Use the excuse of being overwhelmed with tasks, projects, and meetings to never rise to the occasion and tackle real challenges. After all, why would you want to step out of your comfort zone? The beauty of being “busy” is that it gives you every excuse not to focus on what truly matters. You can keep your head down in countless meetings, avoid planning, and manage your time in such a way that the day ends before any real work begins.

Manage the Project by Budget Cuts

Want to fail at your job? Focus solely on the budget, and make sure you cut everything possible. Cut the budget for training, planning, and resources for the workers. Slash funding for things like lunchrooms, clean bathrooms, or even safety measures—because why would anyone need those, right? The more you can cut, the more you can manage by numbers alone without having to actually care about people or outcomes. By managing the project purely through financials, you avoid taking responsibility for real issues. When things inevitably fall apart, you’ll have an excuse ready and blame others for not managing resources better.

Avoid the Field at All Costs

If you really want to ensure your project’s failure, make sure you stay behind your computer all day. Never visit the site or check in with the team. The more disconnected you are, the less you’ll have to deal with actual project challenges or the people who know what’s really going on.

Disconnect from Your Team

Building a relationship with your team, especially superintendents, will make it harder for you to blame them later. So, it’s best to stay distant. The last thing you want is to develop any emotional connection or understanding of their needs. If they’re suffering, that’s not your problem. Make it a point to keep everyone at arm’s length. Avoid conversations, come into the office late, and spend as much time as possible hobnobbing with upper management instead of engaging with the people actually doing the work.

Pit Team Members Against Each Other

To maintain control and reinforce your ego, don’t build a cohesive team. Instead, create divisions and conflicts among them. By fostering a “soap opera” environment, you can keep everyone loyal to you while stifling productivity.

Neglect Planning and Blame Others

A major part of being an incompetent project manager is to avoid proper planning. Don’t bother with real project timelines or resource allocation. When things go wrong, blame it on the tradespeople, the foremen, or anyone else you can find.

Ignore Safety

Never get involved with safety measures on-site. If someone gets hurt, you’ll need to pin the blame on someone else, and if you’re too involved, it could make you look bad. Avoid anything that requires commitment or real oversight, especially when it comes to safety protocols.

Conclusion: How to Solidify Your Role as a Failure

By following these steps, you will effectively ruin your projects, strain relationships with your team, and blame others for the fallout. If this sounds appealing, you’re on the right track to becoming the worst project manager possible.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

What Are The Pre-Construction Stages of A Project?

Read 8 min

In this blog, I’m going to walk you through the pre-construction phases of a project and how to plan a project successfully. We all know that projects don’t fail in the middle—they fail right from the start. To ensure your project is on the right track from day one, it’s important to go beyond the typical phase descriptions and focus on a more comprehensive approach.

Typically, there are five main phases in the pre-construction process: proposal and interview, concept and schematic design, design development, construction drawings, and finally, project start and mobilization. But today, we’re going to rethink those traditional stages and give them a fresh perspective. Here’s how to approach them differently:

1. Win the Project

The first phase is all about securing the project. This goes beyond just submitting a proposal or doing an interview. Here, it’s essential to align with your project team early on. By doing so, you can create a master schedule, logistics plans, and zone maps, while also developing 3D or 4D plans that set the tone for the project. During this phase, focus on the three key aspects that will solve the client’s problems, showing that you’ve already begun working on their behalf even before the contract is signed.

2. Set the Parameters

Once you’ve secured the project, it’s time to establish the conditions of satisfaction, also known as setting the parameters. In this stage, communication is key—you need to ensure you fully understand what the client expects and how the project team will operate. This includes setting clear goals, determining meeting structures, and understanding the org chart that will guide the entire project. Setting these parameters early on ensures everyone is on the same page, which is crucial during the pre-construction design phases.

3. Enable the Design Team

The next phase focuses on enabling the design team. By providing real-time budget and schedule updates, along with conducting constructability reviews, you’re supporting the designers in fleshing out their work. It’s vital to keep communication flowing with the design team, ensuring they have all the information they need. You’ll want to employ tools like A3 reports, choosing by advantages, and risk and opportunity registers to make sure everything aligns with the broader project plan.

4. Plan with the Builders

This phase is about involving the people who will actually build the project. It’s essential to bring the builders—whether they’re your foremen, contractors, or other key stakeholders—into the planning process. The reason for this is simple: You can’t hold them accountable for the project if they weren’t involved in the planning. During this phase, make sure to lock down permitting, secure long-lead procurement, and complete any civil preparations such as relocation of underground utilities. This is also the stage where you’ll finalize your master schedule, logistics drawings, trailer design, risk and opportunity register, and org chart.

5. Prepare for the Start

Now that you’ve set the project up for success, it’s time to prepare for the actual start of construction. This involves locking in your prime agreements and beginning your quality pre-construction meetings with the trades. You’ll also want to engage your 90-day plan, ensuring that the project kicks off on the right foot. Starting strong is crucial, as it’s far easier to make adjustments in the early phases than it is later on.

The Key to Project Success

Ultimately, if you’re tired of the old labels like proposal, interview, schematic design, and construction drawings, think of the process like this: win the project, set the parameters, enable the design team, plan with the builders, and prepare to start strong. When followed correctly, this process will predict project success. As they say, projects don’t go wrong—they start wrong. Ensuring that you follow these five steps will put your project on the right path from the beginning.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

Construction Fails: How Superintendents Fail

Read 8 min

In this blog, we will explore how superintendents can fail spectacularly and take down their entire job while maintaining the ability to avoid responsibility. Whether you’re a construction professional looking to avoid accountability or simply fascinated by how things go wrong, you’re in the right place!

Today, we’re presenting seven key strategies to help you fail as a superintendent. Not only will you create chaos and dysfunction, but you’ll also master the art of blaming others for the mess you’ve made and gain credit for fixing the very fires you started.

Effects of Failing as a Superintendent

Why would anyone want to fail as a superintendent? It’s simple: you get to blame everyone else and use ready-made excuses like, “The new generation doesn’t work hard” or “Supply chain issues.” It’s not your fault, right? And the best part? You get credit for “fixing” the problems you caused, positioning yourself as the heroic firefighter while keeping the chaos alive.

1. Do Not Hold People Accountable

A great way to ensure failure is by making it seem impossible to maintain a clean, safe, and organized job site. Keep the chaos going by not holding anyone accountable, allowing you to badmouth the trades and foremen while elevating yourself. Of course, deep down, you know that the tradespeople are the backbone of the operation, but blaming them keeps you looking important and needed.

2. Do Not Delegate or Work with the Project Manager

By avoiding delegation, you keep all the power. Keeping the plan in your head ensures no one can function without you. If you start delegating and empowering others, they might figure out that they don’t need you, and we can’t have that. You must also avoid working with your project manager (PM); if things go wrong, you’ll need someone to blame.

3. Keep the Plan in Your Head

If no one knows the plan, everyone will have to come to you for answers, ensuring you remain indispensable. Answer your phone all day, every day, and make sure everyone sees how “needed” you are. Don’t even think about sharing your plans or implementing structured processes like Lean or Scrum, which would expose your lack of organization and diminish your control.

4. Skip Steps to Become a Superintendent

Why bother learning the fundamentals of construction, safety, and quality? Just skip ahead to becoming a superintendent without the experience. This way, you’ll avoid creating connections with the team and tradespeople, allowing you to see them as mere objects. The less you know, the less you’ll be held accountable.

5. Lack of Organization

Chaos is your friend! When things are disorganized, it’s harder for anyone to pinpoint who’s at fault, allowing you to stay under the radar. Keep everything a mess, and you’ll have plenty of distractions to hide behind.

6. Do Not Use Technology

Claim that you’re “old school” and don’t know how to use computers. This gives you a perfect excuse to avoid doing actual work and ensures you won’t be expected to improve or modernize your approach. Just walk around pointing fingers and telling others what to do while doing nothing yourself.

7. Do Not Learn Continually

Lastly, resist the urge to learn. Books, courses, or Lean methodologies are dangerous—they might improve your performance! Stick to the tried-and-true excuses like, “I’ve been doing this for 30 years, and I’m not changing now.” If everyone buys into the idea that superintendents don’t learn, you’ll never have to step up or face new challenges.

What Happens If All Superintendents Fail?

If everyone follows these steps, we’ll have an entire industry of mediocrity where no one rises to the occasion. Owners and business leaders will continue thinking they need us, and we can enjoy staying in our comfortable, fixed mindsets.

You’ll learn how to elevate your performance, respect your team, and create a stable, productive environment. But where’s the fun in that, right?

I hope you’ve enjoyed this satirical guide on how to fail as a superintendent. Now go out there and keep that mediocrity alive!

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

How To Scale A Construction Company

Read 8 min

How to Scale a Construction Company: Key Strategies for Success

Scaling a construction company can seem like a daunting challenge, but it doesn’t have to be. In this blog, I’ll break down some actionable techniques that you can start using immediately to scale your business. If you’ve been wondering how to take broad, generalized concepts about scaling and turn them into real, actionable steps, you’re in the right place.

Your Circle of Influence

When it comes to scaling your construction company, understanding your circle of influence is crucial. Every leader—whether it’s you, your business partners, or your directors—brings a certain amount of influence to the table. This collective influence helps steer the organization.

As your company grows, the need for control and influence will inevitably outgrow your current leadership’s reach. That’s why it’s vital to hire people with the right level of influence to help move your organization forward. It’s not just about what they know; it’s about how well they can lead and influence others. So, when scaling, hire those who can expand your company’s capacity to grow.

Implementing the EOS Model

The next key strategy for scaling your construction company is to solidify your business with the EOS (Entrepreneurial Operating System) model. The book Traction outlines this model clearly, and it can help you deliver projects more consistently. Once you’re clear on your operating system, double down on training. Triple it even!

It’s essential that your team knows the operating system inside and out. Monthly field walks as leaders on all of your projects are also crucial for holding teams accountable. The key here is to hire influential people to help implement and hold teams accountable to the operating system. This combination of accountability and consistency leads to great results every time.

Defining Excellence in Your Company

Excellence is often a buzzword, but how do you actually define it? If you want to scale your company, you need to be clear about what excellence means in your context. From my experience, excellence at different companies means different things. For example, at DPR Construction, excellence is part of their culture. At Oakland Construction, it’s their self-perform quality and client relationships.

At Elevate Construction, excellence means how we research, develop, and communicate concepts to implement in the industry. For you, it’s about documenting what excellence means for your team and aligning it with your vision and core values.

Focusing on Core Values and Culture

Your company’s core values and culture are the foundation for growth. At LeanTakt, our core values are transparency, integrity, employee engagement, and getting things done. We hire, promote, and coach based on these values, and they shape our culture. When the company starts to drift away from its core values, we realign and bring everyone back on track.

For you, maintaining a strong culture and focusing on your core values will help you scale much more effectively. When everyone is aligned and bought into the culture, you create an environment where growth happens naturally.

Systematizing Best Practices

To scale efficiently, you need to systematize your best practices. When we find something that works, we document it, standardize it, and share it across the organization. This ensures consistency and helps everyone stay aligned with the company’s vision for excellence.

In our weekly review meetings and client check-ins, we constantly refer back to these best practices to ensure we are meeting our standards. If you want to scale, make sure everyone in your company knows what best practices look like and can easily access them.

Developing and Enabling Leaders

Finally, to scale your company, you need leaders who can carry your vision forward. Once you’ve defined excellence, standardized your processes, and trained your team, the next step is to develop leaders who can take over. These leaders will help scale your business by maintaining your standards, training others, and driving the company toward your vision.

Leadership development is a crucial aspect of scaling because these individuals will be the ones implementing your best practices and maintaining your culture as the company grows.

If you ever need help, feel free to reach out to us. Scaling your construction company is challenging, but by following these steps, it’s easier than you might think!

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

 

 

On we go

How To Manage A Construction Site

Read 11 min

In this blog, we’ll dive into what it truly takes to manage a construction site, ensuring that people can show up and do their best work. I’ll share actionable tips and key steps, focusing on crucial interaction spaces and foundational aspects that must be in place. Let’s face it—you can’t just expect success with a disorganized lot, inadequate fencing, or subpar worker facilities. I’m going to walk you through what it takes to run a remarkable construction site.

The Environment, Not the People, Needs Control

First, let’s get one thing straight: managing a site is different from managing people. I don’t believe in commanding and controlling people—it’s toxic and counterproductive. People should be free to do their best work and express their authentic selves. Instead, focus on controlling the environment. When it comes to the site, I believe in strict management. It should be clean, safe, and organized to the highest standard. We control the site so that the people working on it can thrive. You don’t command and control people—but you can absolutely command and control the environment.

Cleanliness: A Non-Negotiable

A well-managed site is a clean site. Crews should clean up after themselves—electricians shouldn’t be responsible for drywall debris, and vice versa. I always include a provision in contracts mandating that the site remains spotless. If it’s dirty, work stops, the crew cleans up, and the job resumes only when the site is immaculate. Zero tolerance for a messy site has consistently led to excellent results. Regular field walks, daily pictures, reminders, and training reinforce this cleanliness standard. A perfectly clean site is step one to managing a remarkable project.

Safety: Zero Tolerance

Safety isn’t something to negotiate; it’s a core part of site management. A safety culture starts with training and onboarding, followed by consistent reminders. However, safety violations should be handled immediately. On my sites, if someone isn’t adhering to safety protocols, we stop the work, address the issue, and ensure they have the right mindset, tools, or training to proceed. Safety isn’t just about enforcement—it’s about preparation. Our workers undergo OSHA training, daily huddles, and pre-task plans to ensure they’re set up for success. When everyone is on board, the numbers speak for themselves. For example, on a 2-year project with 380 people, we had only 22 incidents requiring people to be sent to a place of safety—a remarkable statistic.

Organization: Everything in Its Place

For a construction site to run smoothly, everything must be organized and have its place. Logistic maps should be living documents that are actively used and updated. When deliveries arrive, the material should be identified, its placement marked, and its arrival time scheduled. This isn’t optional; it’s essential. A well-organized site also means clear laydown areas, coordinated by the format, with gridded, leveled, and stabilized spaces. Your crane, forklift, and hoist operators must follow this plan religiously.

Logistical Support Systems

To run an efficient site, you need proper logistical systems in place. These include cranes, forklifts, loading zones, docks, and scaffolding, among other equipment. The key is not to do the bare minimum to meet a budget, but to set up the site so materials and people can move efficiently. The aim is to avoid bottlenecks that slow down progress. An optimized logistics plan can make all the difference between a project running smoothly and one that is constantly delayed.

Worker Conditions: Invest in Your People

If you want a well-managed site, you must prioritize worker conditions. This means having clean, well-maintained bathrooms, handwash stations, and pleasant lunch areas where people can escape the elements. Morning huddles and worker celebrations are also crucial for building connection and maintaining morale. When workers feel cared for and valued, they are more likely to take pride in their work and contribute to a remarkable site.

The Meeting System: Coordination is Key

An effective meeting system is essential for managing a construction site. I recommend holding a weekly team meeting for high-level planning and coordination, followed by trade partner meetings to handle pull planning and look-ahead planning. Daily Foreman huddles ensure that tomorrow’s work is set up correctly, and morning worker huddles get everyone on the same page for the day. This structured approach allows for the seamless execution of tasks, with everyone aligned on the plan.

Zones and Takt Time: Establish Rhythm and Flow

Zones and Takt time are critical for organizing the work on your site. Zones should be determined based on work density, not square footage, and each zone should have a Takt time to guide the rhythm of work. When properly implemented, this system creates a predictable flow of work through the project, ensuring that trades can move efficiently without delays or interruptions.

Clear the Path: Remove Roadblocks in Advance

As a manager, your main focus should be clearing the path for your trades. This means identifying and removing roadblocks long before they become problems. Weekly work planning and six-week look-ahead meetings with the Foreman should be focused on anticipating issues and addressing them before they slow down progress. If you’re proactive in clearing the path, your trades will be able to work smoothly and efficiently.

Plan with Your Last Planners

To manage the site effectively, involve your last planners in the planning process. Ask them what they expect, align on standards, and collaborate on short-interval plans. This shared responsibility will create a stronger management team and ensure that everyone is on the same page.

Solve Problems Together

Problems aren’t the issue—the real problem is thinking there aren’t any. Involve your trade partners in identifying and solving problems as they arise. Open communication and teamwork are key to addressing issues quickly and keeping the project on track.

In conclusion, a remarkable construction site thrives on well-managed environments, not micromanaged people. Prioritize cleanliness, safety, and organization while providing logistical support and quality worker conditions. Effective planning, structured meetings, and proactive problem-solving keeps everything on track. By removing roadblocks and empowering your team, you set the foundation for a successful project.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

 

 

On we go

What is the Foreman`s job?

Read 5 min

In the realm of construction, the foreman plays a pivotal role in ensuring project success. This individual is responsible for overseeing daily operations, coordinating teams, and maintaining quality standards. While their responsibilities may seem straightforward, the nuances of the foreman’s job can be complex. In this blog post, we’ll delve into the key aspects of a foreman’s role and explore how they can effectively lead their teams to achieve project goals.

The Foreman as a Leader

A foreman is more than just a supervisor; they are a leader. Effective leadership requires a combination of technical expertise, strong communication skills, and a deep understanding of the construction process. Foremen must be able to:

  • Motivate and inspire their teams to achieve their best.
  • Communicate effectively with all stakeholders, including workers, engineers, and management.
  • Resolve conflicts peacefully and professionally.
  • Make sound decisions under pressure.
  • Foster a positive work environment that promotes safety and productivity.

Key Responsibilities of a Foreman

  • Planning and Preparation: Foremen are responsible for planning work, ensuring that materials and equipment are available, and coordinating with other trades. They must also adhere to safety regulations and quality standards.
  • Team Management: A foreman’s ability to manage their team is crucial. This includes assigning tasks, providing training, and addressing issues promptly.
  • Quality Control: Foremen must ensure that work is completed to the highest standards. This involves inspecting work, identifying defects, and taking corrective action.
  • Safety Oversight: Safety is a top priority in the construction industry. Foremen must implement safety procedures, conduct regular safety inspections, and address any safety hazards.
  • Problem-Solving: Foremen often encounter unexpected challenges. They must be able to identify problems, develop solutions, and implement them effectively.

Conclusion

The role of a foreman is essential to the success of any construction project. By effectively leading their teams, ensuring quality, and maintaining safety, foremen can make a significant contribution to the industry. As the construction industry continues to evolve, the demand for skilled foremen will only grow.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

Construction Scheduling 101

Read 5 min

In this blog post, we’ll delve into the world of construction scheduling, exploring various methods and techniques to effectively plan and execute your projects.

Understanding Different Scheduling Types

  • Gantt Charts: A classic tool for project visualization, Gantt charts depict activities, their duration, and dependencies in a simple timeline format. While they’re useful for basic scheduling, they may fall short when dealing with complex projects.
  • Critical Path Method (CPM): CPM identifies the critical path, the sequence of activities that determine the project’s overall duration. By analyzing dependencies and calculating float times, CPM helps pinpoint potential bottlenecks and optimize resource allocation.
  • Line of Balance: This method is particularly suited for repetitive projects, focusing on maintaining a consistent production rate across different stages or locations. It helps visualize the flow of work and identify potential imbalances.
  • Location-Based Scheduling: As the name suggests, this approach emphasizes the spatial aspect of construction projects. By mapping activities to specific locations, you can better coordinate resource allocation, minimize conflicts, and optimize workflow.
  • Takt Planning: A powerful tool for lean construction, Takt Planning aligns production rates with customer demand. It involves breaking down work into smaller, repetitive tasks and sequencing them to achieve a smooth, continuous flow.
  • Last Planner System: This collaborative approach emphasizes predictability and eliminates waste by involving all stakeholders in planning and execution. It combines elements of Takt Planning with weekly work planning and daily check-ins to ensure timely completion.

Integrating Multiple Methods

While each scheduling method has its strengths, combining them can often yield optimal results. For instance, you might use Takt Planning for overall project sequencing, CPM for identifying critical paths, and Location-Based Scheduling for coordinating activities within specific zones.

Overcoming Challenges and Maximizing Efficiency

  • Identify Roadblocks: Use tools like Scrum to proactively address potential issues and bottlenecks.
  • Leverage Technology: Explore software solutions that can streamline scheduling processes, improve collaboration, and provide valuable insights.
  • Seek Professional Guidance: Consider consulting with experts in construction scheduling to gain valuable advice and tailored solutions.

Conclusion

By understanding the various scheduling methods and their applications, you can develop a comprehensive approach that suits your project’s unique requirements. By effectively planning and managing your construction projects, you can improve efficiency, reduce costs, and deliver high-quality results.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

Construction Fails: How Owner’s Reps Fail?

Read 5 min

This blog post is intended for entertainment purposes only. While it offers a humorous perspective on the role of an owner’s representative, it’s important to note that the practices described are detrimental to the success of a construction project.

Have you ever wondered how an owner’s representative could possibly ruin a project? Well, look no further. In this blog post, we’re going to dive deep into the world of construction chaos and explore the worst possible strategies for an owner’s rep.

So, if your goal is to sabotage a project and make everyone’s life miserable, keep reading.

1. Create Chaos and Confusion

  • Push, Rush, and Panic: The more stressed and overwhelmed your team is, the more likely they are to make mistakes and miss deadlines.
  • Micromanage Everything: Constantly second-guessing the decisions of your team will only lead to frustration and delays.
  • Poor Communication: Use vague and confusing language to create misunderstandings and conflicts.

2. Prioritize Your Own Interests

  • Line Your Pockets: Find ways to maximize your own profits, even if it means cutting corners and compromising quality.
  • Blame Everyone Else: When things go wrong, shift the blame onto the contractors, subcontractors, or anyone else you can.
  • Ignore Stakeholder Needs: Don’t bother listening to the concerns of the owner or other stakeholders.

3. Use Outdated and Ineffective Tools

  • CPM Schedules: Rely on outdated project management tools that are difficult to understand and use.
  • Excessive Paperwork: Create mountains of unnecessary paperwork to keep everyone busy and overwhelmed.

4. Foster a Negative Work Environment

  • Create a Toxic Culture: Encourage a culture of fear, mistrust, and blame.
  • Sabotage Teamwork: Pit team members against each other to create division and conflict.

Remember, these are the worst possible strategies for an owner’s representative. A successful owner’s rep should focus on:

  • Clear Communication: Ensuring everyone is on the same page.
  • Collaboration: Working together with the team to achieve project goals.
  • Problem-Solving: Identifying and addressing issues proactively.
  • Building Relationships: Fostering trust and respect among all stakeholders.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

What Is A KPI In Construction?

Read 7 min
In this blog, we’re going to explore KPIs that are essential for construction projects and which ones are truly valuable. You’ll learn to identify the KPIs that matter most, how to use them effectively, and which ones might not be as critical. Just like a human’s pulse indicates overall health, there are key indicators that reveal the “pulse” of your project. Let’s dive into it!

What is a KPI in Construction?

A KPI in construction is designed to measure certain metrics that reflect the performance of the project. These can be categorized into leading indicators and lagging indicators. Leading indicators help you take preventative actions before problems arise, while lagging indicators assess the outcomes after the fact. Although both are important, focusing on leading indicators can prevent issues before they become major problems.

Common Leading Indicators in Construction

Here are some common leading indicators in construction:
  • Cost performance
  • Schedule performance
  • Quality performance
  • Safety metrics
  • Productivity and efficiency numbers
  • Customer satisfaction metrics
  • Sustainability-related metrics
These KPIs help provide a holistic view of how your project is progressing in real time.

Useless KPIs in Construction

Not all KPIs are created equal. Some, like those tied to the Critical Path Method (CPM) and float tracking, may not add much value to your project. These are often part of traditional project management, but they can be overly complex or just not relevant. Instead of focusing on outdated metrics, it’s better to concentrate on KPIs that truly drive project success.

Why You Should Avoid Managing Budgets vs. Investments

A common pitfall in construction management is focusing solely on cutting costs and managing the budget. While reducing unnecessary expenses is important, it’s equally crucial to invest in areas that improve project outcomes—such as worker training, site conditions, and pre-construction efforts. For instance, cutting the pre-construction budget might save money upfront, but it could lead to costly overruns and delays later.

KPIs That Matter: Key Indicators for Project Success

Let’s talk about the KPIs that will genuinely predict project success. These include:

1. Quality Indicators

  • Point of Release: Tracks the progress of trade partners from pre-mobilization to final inspection.
  • Number of Pre-Construction Meetings: Ensures all required pre-construction meetings are held and result in quality checklists.
  • Percentage of Crews Installing According to Quality Checklists: Tracks how well crews adhere to quality standards.

2. Schedule Indicators

  • Remaining Buffer Ratio: Measures how much buffer time remains compared to what was initially planned.
  • Roadblock Removal Average: Tracks how quickly obstacles are identified and removed before impacting work.
  • Successful Handoff Percentage: Measures how smoothly trades hand off work between zones.
  • Percent Plan Complete (PPC): Tracks the percentage of promised tasks that were completed on time.

3. Financial Projections

  • Gross Profit: Tracks overall project profitability.
  • Contingency: Measures how well contingency funds are managed.
  • Risk and Opportunity: Identifies potential financial risks and opportunities for profit.

4. Buyout and Procurement

  • Buyout Log: Tracks whether trades are contracted on time with all required insurance and permissions.
  • Procurement Log: Measures the success rate of material procurement and tracks any items that are delayed.

5. Team Health

  • A healthy team is essential for project success. Using a team health assessment tracker can help measure team morale and overall well-being.

Conclusion: Stay Ahead with the Right KPIs

Tracking the right KPIs allows you to take corrective action and ensure the success of your construction project. By focusing on leading indicators and prioritizing investments over budget cuts, you can avoid common pitfalls and deliver outstanding results.

If you want to learn more we have:

-Takt Virtual Training: (Click here)
-Check out our Youtube channel for more info: (Click here) 
-Listen to the Elevate Construction podcast: (Click here) 
-Check out our training programs and certifications: (Click here)
-The Takt Book: (Click here)

Discover Jason’s Expertise:

Meet Jason Schroeder, the driving force behind Elevate Construction IST. As the company’s owner and principal consultant, he’s dedicated to taking construction to new heights. With a wealth of industry experience, he’s crafted the Field Engineer Boot Camp and Superintendent Boot Camp – intensive training programs engineered to cultivate top-tier leaders capable of steering their teams towards success. Jason’s vision? To expand his training initiatives across the nation, empowering construction firms to soar to unprecedented levels of excellence.

On we go!

    faq

    General Training Overview

    What construction leadership training programs does LeanTakt offer?
    LeanTakt offers Superintendent/PM Boot Camps, Virtual Takt Production System® Training, Onsite Takt Simulations, and Foreman & Field Engineer Training. Each program is tailored to different leadership levels in construction.
    Who should attend LeanTakt’s training programs?
    Superintendents, Project Managers, Foremen, Field Engineers, and trade partners who want to improve planning, communication, and execution on projects.
    How do these training programs improve project performance?
    They provide proven Lean and Takt systems that reduce chaos, improve reliability, strengthen collaboration, and accelerate project delivery.
    What makes LeanTakt’s training different from other construction courses?
    Our programs are hands-on, field-tested, and focused on practical application—not just classroom theory.
    Do I need prior Lean or takt planning experience to attend?
    No. Our programs cover foundational principles before moving into advanced applications.
    How quickly can I apply what I learn on real projects?
    Most participants begin applying new skills immediately, often the same week they complete the program.
    Are these trainings designed for both office and field leaders?
    Yes. We equip both project managers and superintendents with tools that connect field and office operations.
    What industries benefit most from LeanTakt training?
    Commercial, multifamily, residential, industrial, and infrastructure projects all benefit from flow-based planning.
    Do participants receive certificates after completing training?
    Yes. Every participant receives a LeanTakt Certificate of Completion.
    Is LeanTakt training recognized in the construction industry?
    Yes. Our programs are widely respected among leading GCs, subcontractors, and construction professionals.

    Superintendent / PM Boot Camp

    What is the Superintendent & Project Manager Boot Camp?
    It’s a 5-day immersive training for superintendents and PMs to master Lean leadership, takt planning, and project flow.
    How long does the Superintendent/PM Boot Camp last?
    Five full days of hands-on training.
    What topics are covered in the Boot Camp curriculum?
    Lean leadership, Takt Planning, logistics, daily planning, field-office communication, and team health.
    How does the Boot Camp improve leadership and scheduling skills?
    Yes. You’ll learn how to run day huddles, team meetings, worker huddles, and Lean coordination processes.
    Who is the Boot Camp best suited for?
    Construction leaders responsible for delivering projects, including Superintendents, PMs, and Field Leaders.
    What real-world challenges are simulated during the Boot Camp?
    Schedule breakdowns, trade conflicts, logistics issues, and communication gaps.
    Will I learn Takt Planning at the Boot Camp?
    Yes. Takt Planning is a core focus of the Boot Camp.
    How does this Boot Camp compare to traditional PM certification?
    It’s practical and execution-based rather than exam-based. You learn by doing, not just studying theory.
    Can my entire project team attend the Boot Camp together?
    Yes. Teams attending together often see the greatest results.
    What kind of real-world challenges do we simulate?
    Improved project flow, fewer delays, better team communication, and stronger leadership confidence.

    Takt Production System® Virtual Training

    What is the Virtual Takt Production System® Training?
    It’s an expert-led online program that teaches Lean construction teams how to implement takt planning.
    How does virtual takt training work?
    Delivered online via live sessions, interactive discussions, and digital tools.
    What are the benefits of online takt planning training?
    Convenience, global accessibility, real-time learning, and immediate application.
    Can I access the virtual training from anywhere?
    Yes. It’s fully web-based and accessible worldwide.
    Can I access the virtual training from anywhere?
    Yes. It’s fully web-based and accessible worldwide.
    What skills will I gain from the Virtual TPS® Training?
    Macro and micro Takt planning, weekly updates, flow management, and CPM integration.
    How long does the virtual training program take?
    The program is typically completed in multiple live sessions across several days.
    Can I watch recordings if I miss a session?
    Yes. Recordings are available to all participants.
    Do you offer group access or company licenses for the virtual training?
    Yes. Teams and companies can enroll together at discounted rates.
    How does the Virtual TPS® Training integrate with CPM tools?
    We show how to align Takt with CPM schedules like Primavera P6 or MS Project.

    Onsite Takt Simulation

    What is a Takt Simulation in construction training?
    It’s a live, interactive workshop that demonstrates takt planning on-site.
    How does the Takt Simulation workshop work?
    Teams participate in hands-on exercises to learn the flow and rhythm of a Takt-based project.
    Can I choose between a 1-day or 2-day Takt Simulation?
    Yes. We offer flexible formats to fit your team’s schedule and needs.
    Who should participate in the Takt Simulation workshop?
    Superintendents, PMs, site supervisors, contractors, and engineers.
    How does a Takt Simulation improve project planning?
    It shows teams how to structure zones, manage flow, and coordinate trades in real time.
    What will my team learn from the onsite simulation?
    How to build and maintain takt plans, manage buffers, and align trade partners.
    Is the simulation tailored to my specific project type?
    Yes. Scenarios can be customized to match your project.
    How do Takt Simulations improve trade partner coordination?
    They strengthen collaboration by making handoffs visible and predictable.
    What results can I expect from an onsite Takt Simulation?
    Improved schedule reliability, better trade collaboration, and reduced rework.
    How many people can join a Takt Simulation session?
    Group sizes are flexible, but typically 15–30 participants per session.

    Foreman & Field Engineer Training

    What is Foreman & Field Engineer Training?
    It’s an on-demand, practical program that equips foremen and engineers with leadership and planning skills.
    How does this training prepare emerging leaders?
    By teaching communication, crew management, and execution strategies.
    Is the training on-demand or scheduled?
    On-demand, tailored to your team’s timing and needs.
    What skills do foremen and engineers gain from this training?
    Planning, safety leadership, coordination, and communication.
    How does the training improve communication between field and office?
    It builds shared systems that align superintendents, engineers, and managers.
    Can the training be customized for my team’s needs?
    Yes. Programs are tailored for your project or company.
    What makes this program different from generic leadership courses?
    It’s construction-specific, field-tested, and focused on real project application.
    How do foremen and field engineers apply this training immediately?
    They can use new systems for planning, coordination, and daily crew management right away.
    Is the training suitable for small construction companies?
    Yes. Small and large teams alike benefit from building flow-based leadership skills.

    Testimonials

    Testimonials

    "The bootcamp I was apart of was amazing. Its was great while it was happening but also had a very profound long-term motivation that is still pushing me to do more, be more. It sounds a little strange to say that a construction bootcamp changed my life, but it has. It has opened my eyes to many possibilities on how a project can be successfully run. It’s also provided some very positive ideas on how people can and should be treated in construction.

    I am a hungry person by nature, so it doesn’t take a lot to get to participate. I loved the way it was not just about participating, it was also about doing it with conviction, passion, humility and if it wasn’t portrayed that way you had to do it again."

    "It's great to be a part of a company that has similar values to my own, especially regarding how we treat our trade partners. The idea of "you gotta make them feel worse to make them do better" has been preached at me for years. I struggled with this as you will not find a single psychology textbook stating these beliefs. In fact it is quite the opposite, and causing conflict is a recipe for disaster. I'm still honestly in shock I have found a company that has based its values on scientific facts based on human nature. That along with the Takt scheduling system makes everything even better. I am happy to be a part of a change that has been long overdue in our industry!"

    "Wicked team building, so valuable for the forehumans of the sub trades to know the how and why. Great tools and resources. Even though I am involved and use the tools every day, I feel like everything is fresh and at the forefront to use"

    "Jason and his team did an incredible job passing on the overall theory of what they do. After 3 days of running through the course I cannot see any holes in their concept. It works. it's proven to work and I am on board!"

    "Loved the pull planning, Takt planning, and logistic model planning. Well thought out and professional"

    "The Super/PM Boot Camp was an excellent experience that furthered my understanding of Lean Practices. The collaboration, group involvement, passion about real project site experiences, and POSITIVE ENERGY. There are no dull moments when you head into this training. Jason and Mr. Montero were always on point and available to help in the break outs sessions. Easily approachable to talk too during breaks and YES, it was fun. I recommend this training for any PM or Superintendent that wants to further their career."

    agenda

    Day 1

    Foundations & Macro Planning

    day2

    Norm Planning & Flow Optimization

    day3

    Advanced Tools & Comparisons

    day4

    Buffers, Controls & Finalization

    day5

    Control Systems & Presentations

    faq

    UNDERSTANDING THE TRAINING

    What is the Virtual Takt Production System® Training by LeanTakt?
    It’s an expert-led online program designed to teach construction professionals how to implement Takt Planning to create flow, eliminate chaos, and align teams across the project lifecycle.
    Who should take the LeanTakt virtual training?
    This training is ideal for Superintendents, Project Managers, Engineers, Schedulers, Trade Partners, and Lean Champions looking to improve planning and execution.
    What topics are covered in the online Takt Production System® course?
    The course covers macro and micro Takt planning, zone creation, buffers, weekly updates, flow management, trade coordination, and integration with CPM tools.
    What makes LeanTakt’s virtual training different from other Lean construction courses?
    Unlike theory-based courses, this training is hands-on, practical, field-tested, and includes live coaching tailored to your actual projects.
    Do I get a certificate after completing the online training?
    Yes. Upon successful completion, participants receive a LeanTakt Certificate of Completion, which validates your knowledge and readiness to implement Takt.

    VALUE AND RESULTS

    What are the benefits of Takt Production System® training for my team?
    It helps teams eliminate bottlenecks, improve planning reliability, align trades, and reduce the chaos typically seen in traditional construction schedules.
    How much time and money can I save with Takt Planning?
    Many projects using Takt see 15–30% reductions in time and cost due to better coordination, fewer delays, and increased team accountability.
    What’s the ROI of virtual Takt training for construction teams?
    The ROI comes from faster project delivery, reduced rework, improved communication, and better resource utilization — often 10x the investment.
    Will this training reduce project delays or rework?
    Yes. By visualizing flow and aligning trades, Takt Planning reduces miscommunication and late handoffs — major causes of delay and rework.
    How soon can I expect to see results on my projects?
    Most teams report seeing improvement in coordination and productivity within the first 2–4 weeks of implementation.

    PLANNING AND SCHEDULING TOPICS

    What is Takt Planning and how is it used in construction?
    Takt Planning is a Lean scheduling method that creates flow by aligning work with time and space, using rhythm-based planning to coordinate teams and reduce waste.
    What’s the difference between macro and micro Takt plans?
    Macro Takt plans focus on the overall project flow and phase durations, while micro Takt plans break down detailed weekly tasks by zone and crew.
    Will I learn how to build a complete Takt plan from scratch?
    Yes. The training teaches you how to build both macro and micro Takt plans tailored to your project, including workflows, buffers, and sequencing.
    How do I update and maintain a Takt schedule each week?
    You’ll learn how to conduct weekly updates using lookaheads, trade feedback, zone progress, and digital tools to maintain schedule reliability.
    Can I integrate Takt Planning with CPM or Primavera P6?
    Yes. The training includes guidance on aligning Takt plans with CPM logic, showing how both systems can work together effectively.
    Will I have access to the instructors during the training?
    Yes. You’ll have opportunities to ask questions, share challenges, and get real-time feedback from LeanTakt coaches.
    Can I ask questions specific to my current project?
    Absolutely. In fact, we encourage it — the training is designed to help you apply Takt to your active jobs.
    Is support available after the training ends?
    Yes. You can access follow-up support, coaching, and community forums to help reinforce implementation.
    Can your tools be customized to my project or team?
    Yes. We offer customizable templates and implementation options to fit different project types, teams, and tech stacks.
    When is the best time in a project lifecycle to take this training?
    Ideally before or during preconstruction, but teams have seen success implementing it mid-project as well.

    APPLICATION & TEAM ADOPTION

    What changes does my team need to adopt Takt Planning?
    Teams must shift from reactive scheduling to proactive, flow-based planning with clear commitments, reliable handoffs, and a visual management mindset.
    Do I need any prior Lean or scheduling experience?
    No prior Lean experience is required. The course is structured to take you from foundational principles to advanced application.
    How long does it take for teams to adapt to Takt Planning?
    Most teams adapt within 2–6 weeks, depending on project size and how fully the system is adopted across roles.
    Can this training work for smaller companies or projects?
    Absolutely. Takt is scalable and especially powerful for small teams seeking better structure and predictability.
    What role do trade partners play in using Takt successfully?
    Trade partners are key collaborators. They help shape realistic flow, manage buffers, and provide feedback during weekly updates.

    VIRTUAL FORMAT & ACCESSIBILITY

    Can I access the virtual training from anywhere?
    Yes. The training is fully accessible online, making it ideal for distributed teams across regions or countries.
    Is this training available internationally?
    Yes. LeanTakt trains teams around the world and supports global implementations.
    Can I watch recordings if I miss a session?
    Yes. All sessions are recorded and made available for later viewing through your training portal.
    Do you offer group access or company licenses?
    Yes. Teams can enroll together at discounted rates, and we offer licenses for enterprise rollouts.
    What technology or setup do I need to join the virtual training?
    A reliable internet connection, webcam, Miro, Spreadsheets, and access to Zoom.

    faq

    GENERAL FAQS

    What is the Superintendent / PM Boot Camp?
    It’s a hands-on leadership training for Superintendents and Project Managers in the construction industry focused on Lean systems, planning, and communication.
    Who is this Boot Camp for?
    Construction professionals including Superintendents, Project Managers, Field Engineers, and Foremen looking to improve planning, leadership, and project flow.
    What makes this construction boot camp different?
    Real-world project simulations, expert coaching, Lean principles, team-based learning, and post-camp support — all built for field leaders.
    Is this just a seminar or classroom training?
    No. It’s a hands-on, immersive experience. You’ll plan, simulate, collaborate, and get feedback — not sit through lectures.
    What is the focus of the training?
    Leadership, project planning, communication, Lean systems, and integrating office-field coordination.

    CURRICULUM & OUTCOMES

    What topics are covered in the Boot Camp?
    Takt planning, day planning, logistics, pre-construction, team health, communication systems, and more.
    What is Takt Planning and why is it taught?
    Takt is a Lean planning method that creates flow and removes chaos. It helps teams deliver projects on time with less stress.
    Will I learn how to lead field teams more effectively?
    Yes. This boot camp focuses on real leadership challenges and gives you systems and strategies to lead high-performing teams.
    Do you cover daily huddles and meeting systems?
    Yes. You’ll learn how to run day huddles, team meetings, worker huddles, and Lean coordination processes.
    What kind of real-world challenges do we simulate?
    You’ll work through real project schedules, logistical constraints, leadership decisions, and field-office communication breakdowns.

    LOGISTICS & FORMAT

    Is the training in-person or virtual?
    It’s 100% in-person to maximize learning, feedback, and team-based interaction.
    How long is the Boot Camp?
    It runs for 5 full days.
    Where is the Boot Camp held?
    Locations vary — typically hosted in a professional training center or project setting. Contact us for the next available city/date.
    Do you offer follow-up coaching after the Boot Camp?
    Yes. Post-camp support is included so you can apply what you’ve learned on your projects.
    Can I ask questions about my actual project?
    Absolutely. That’s encouraged — bring your current challenges.

    PRICING & VALUE

    How much does the Boot Camp cost?
    $5,000 per person.
    Are there any group discounts?
    Yes — get 10% off when 4 or more people from the same company attend.
    What’s the ROI for sending my team?
    Better planning = fewer delays, smoother coordination, and higher team morale — all of which boost productivity and reduce costs.
    Will I see results immediately?
    Most participants apply what they’ve learned as soon as they return to the jobsite — especially with follow-up support.
    Can this replace other leadership training?
    In many cases, yes. This Boot Camp is tailored to construction professionals, unlike generic leadership seminars.

    SEO-BASED / HIGH-INTENT SEARCH QUESTIONS

    What is the best leadership training for construction Superintendents?
    Our Boot Camp offers real-world, field-focused leadership training tailored for construction leaders.
    What’s included in a Superintendent Boot Camp?
    Takt planning, day planning, logistics, pre-construction systems, huddles, simulations, and more.
    Where can I find Lean construction training near me?
    Check our upcoming in-person sessions or request a private boot camp in your city.
    How can I improve field and office communication on a project?
    This Boot Camp teaches you tools and systems to connect field and office workflows seamlessly.
    Is there a training to help reduce chaos on construction sites?
    Yes — this program is built specifically to turn project chaos into flow through structured leadership.

    agenda

    Day 1

    Agenda

    Outcomes

    Day 2

    Agenda

    Outcomes

    Day 3

    Agenda

    Outcomes

    Day 4

    Agenda

    Outcomes

    Day 5

    Agenda

    Outcomes